Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0067
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | ENGR Engineering Final | Not Ready | The engineering final cannot occur until all site improvements are completed. The rezoning conditions are not yet satisfied. See zoning final for path requirements. | |
| 05/13/2025 | ENGR Engineering Final | Passed | ||
| 12/19/2023 | ENGR Engineering Final | Partial Pass | Contractor still needs to plant all the plants out of the nursery area. I am in the area on the north east part of the project needs to be completed per plan. And the basin by the nursery needs to be completed also |