Permit: DP21-0002
Permit Details
Status:
Issued
Type:
Development Package
Address:
9020 E EAGLE FEATHER RD
Address NEW:
9020 E EAGLE FEATHER RD
Apply Date:
01/05/2021
Applicant:
Billy Box
Description:
Revision 4 - Site/Grading - Casitas on Catalina.
Permit Reviews
Permit Number - DP21-0002
Permit Status: Issued
Permit Description: Revision 4 - Site/Grading - Casitas on Catalina.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2021 | DEV PKG - OK TO SUBMIT | 01/13/2021 | COMPLETED |
| 01/08/2021 | DEV PKG | 03/03/2021 | COMPLETED |
| 02/14/2022 | DEV PKG - OK TO SUBMIT | 03/30/2022 | COMPLETED |
| 03/22/2021 | DEV PKG - RESUBMITTAL | 04/29/2021 | COMPLETED |
| 03/30/2022 | REVISION - - 1ST | 06/14/2022 | COMPLETED |
| 06/16/2022 | REVISION - - 1ST | 09/29/2022 | COMPLETED |
| 07/26/2021 | DEV PKG - RESUBMITTAL | 09/09/2021 | COMPLETED |
| 10/08/2021 | DEV PKG - RESUBMITTAL | 01/27/2022 | COMPLETED |
| 10/12/2022 | REVISION - - 1ST | 10/19/2022 | ACTIVE |
| 12/24/2021 | DEV PKG - RESUBMITTAL | 12/24/2021 | STOPPED |
| 10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/22/2022 | APPROVED |
| 08/04/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/13/2023 | APPROVED |
| 12/29/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/30/2022 | APPROVED |
| 10/30/2024 | DEVELOPMENT PACKAGE NEW v.2 | 11/13/2024 | REQUIRES RESUBMIT |
| 11/13/2024 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 12/17/2024 | REQUIRES RESUBMIT |
| 04/29/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 06/02/2025 | APPROVED |
| 11/13/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/13/2024 | REQUIRES RESUBMIT |
| 01/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 02/28/2025 | APPROVED |
| 10/08/2024 | DEVELOPMENT PACKAGE NEW v.1 | 10/09/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP21-0002
Permite Description: Revision 4 - Site/Grading - Casitas on Catalina.
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 09/02/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues or concerns. Large material and debris piles on site.} ; {Activity date: 07/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued 9062 E Eagle Feather Rd} ; {Activity date: 07/18/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /NO CHANGES AS OF TODAY. } ; {Activity date: 06/08/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Unscheduled courtesy inspection. Please schedule inspections biweekly as requested } |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
| 11/03/2023 | ENGR Grading Final | N/A | Partial Pass | Spoke to Rob Brack on the phone wanted to note the (2) basin locations and Rip Rap areas at the rear NW corner of site are continuous. |
| 11/03/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Spoke to Rob Brack on the phone and he wanted to note and take photos of the Basin located on the NW section of site. |
| 07/24/2023 | COT - ENGR - Stormwater | N/A | Not Ready | entry way to site is acceptable. |
| 08/21/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | two solid waste enclosures. |
| 07/24/2023 | ENGR - Drainage Structures | N/A | Partial Pass | |
| 10/15/2024 | Consultation SITE | N/A | Partial Pass | Constructions ongoing contractor called me out for inspection for asphalt and curb. No concerns at this time on those issues. |
| 08/07/2024 | For trash and recycling enclosures | N/A | Partial Pass | Contractor is good to pour the footer at the floor and the apron |
| 11/05/2025 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 01/30/2024 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP21-0002
Permit Description: Revision 4 - Site/Grading - Casitas on Catalina.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | COT - SITE - Zoning Intermediate | Passed | ||
| 12/19/2023 | ENGR Grading Final | Passed | ||
| 07/23/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor that he needs to call Lynn every two weeks for stormwater had to call in for the trash closures that have not been built yet | |
| 11/05/2025 | SITE - Zoning Final | Passed | ||
| 11/05/2025 | SITE - Stormwater Final Inspection | Passed | ||
| 11/18/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 11/18/2025 | ENGR Engineering Final | Passed |