Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0002
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
| 07/19/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Conversation with Rob from AF Sterling at 520-955-1150 Please schedule inspections biweekly or sooner as needed 9062 E Eagle Feather Rd, |
| 04/28/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified. 9020 E EAGLE FEATHER RD |
| 04/28/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by VVERA1 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified. |
| 04/11/2023 | PDSD Engineering Division Pre-Construction SITE | Complete (Recurring) | ||
| 06/02/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Utility work and building construction in progress. Slab only at this time. Contractor shall schedule inspections for Stormwater. Follow up biweekly as previously requested. | |
| 07/23/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor that he needs to call Lynn every two weeks for stormwater had to call in for the trash closures that have not been built yet | |
| 08/21/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | two solid waste enclosures. |