Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 07/19/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Conversation with Rob from AF Sterling at 520-955-1150 Please schedule inspections biweekly or sooner as needed
9062 E Eagle Feather Rd,
|
| 04/28/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified.
9020 E EAGLE FEATHER RD |
| 04/28/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified. |
| 04/11/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Complete (Recurring) |
|
| 06/02/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Partial Pass |
Utility work and building construction in progress. Slab only at this time. Contractor shall schedule inspections for Stormwater. Follow up biweekly as previously requested. |
| 07/23/2024 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Inform the contractor that he needs to call Lynn every two weeks for stormwater had to call in for the trash closures that have not been built yet |
| 08/21/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Partial Pass |
two solid waste enclosures. |