Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/31/2024 |
Consultation SITE |
|
Partial Pass |
Explain to the contractors need to call Lynn every two weeks for swap, water, and STORMWATER |
| 09/10/2024 |
Consultation SITE |
|
Partial Pass |
Contractor cutting the grade with the roads and parking area |
| 09/10/2024 |
Consultation SITE |
|
Partial Pass |
Contractor cutting the grade with the roads and parking area |
| 10/15/2024 |
Consultation SITE |
|
Partial Pass |