Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
05/18/2022 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by VVERA1 - Par SWPpp and trackout protection
04/28/2022 SITE - Stormwater Setup and Controls BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified. 9020 E EAGLE FEATHER RD
04/28/2022 SITE - Stormwater Setup and Controls BBENEDON Not ready for Inspection Entered by VVERA1 - not ready. Please schedule for a preconstruction meeting. Please provide site address and SwPPP. Site has been cleared, boundaries and native plants have been identified.
04/28/2022 SITE - Stormwater Setup and Controls DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL AT THIS TIME. MET WITH ROB BRACH TO DISCUSS THE INSTALLATION OF STORMWATER CONTROLS. HE WILL HAVE THE TRACK OUT ROCK, WADDLE, AND SIGNS INSTALLED WITHIN THE NEXT 2 WEEKS IF POSSIBLE. HE WILL SCHEDULE INSPECTIONS FOR EVERY TWO WEEKS THROUGH THE DURATION OF THIS PROJECT. 9125 E CATALINA HY
04/11/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Grading and utility work. Building construction. Several slabs have been poured but no vertical head this time. Stormwater controls in place.
06/02/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Stormwater protections in place. No issues at this time.
11/21/2023 SITE - Stormwater Setup and Controls Not Ready Met with Rob from AF Sterling about what will be required to start getting TCO on some of the buildings