Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
03/21/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, DEMOLITION OF THE EXISTING STRUCTURES HAS BEEN HAPPENING ON THIS SITE AT THIS TIME. I WILL BE LOOKING AT THIS SITE ON THURSDAY WITH ROB FROM AF STERLING TO FIGURE OUT WHAT THEIR FUTURE DEMAND ON THIS SITE WILL BE. 9125 E Catalina Hwy,
09/02/2022 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Grading.
07/28/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Material exporting and importing 9062 E Eagle Feather Rd
07/18/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN/ CUTTING SUB GRADE
02/08/2023 ENGR Grading Final Complete (Recurring)
02/08/2023 ENGR Grading Final Complete (Recurring) Utility work and grading in progress. Building construction as well underway. Please schedule inspections biweekly for this project. Thank you.
02/08/2023 ENGR Grading Final Complete (Recurring) Utility work and grading in progress. Building construction as well underway. Please schedule inspections biweekly for this project. Thank you.
04/28/2023 ENGR Grading Final Complete (Recurring) Have looked at this site, and the contractor is currently working on utilities installation for water, gas, Sewer and electric. Also, on the site, they have poured some of these slabs for future houses along the eastern half of the project.
06/27/2023 ENGR Grading Final Complete (Recurring) grading and building construction in progress. Material piles throughout.
07/24/2023 ENGR Grading Final Not Ready AWAITING GRADING.
07/26/2023 ENGR Grading Final Partial Pass Utility work and building construction in progress
08/24/2023 ENGR Grading Final Passed additional “dobies” in floor matt and debris in trenches
09/25/2023 ENGR Grading Final Not Ready northern portion of site driveways asphalt paved. southern portion not. AB being placed at time of inspection.
11/03/2023 ENGR Grading Final Partial Pass Spoke to Rob Brack on the phone wanted me to take pictures and note the (2) Basin locations are continuing as well as the Rip Rap work located at NW rear section of site.
11/03/2023 ENGR Grading Final Partial Pass Spoke to Rob Brack on the phone wanted to note the (2) basin locations and Rip Rap areas at the rear NW corner of site are continuous.
11/13/2023 ENGR Grading Final Not Ready
11/14/2023 ENGR Grading Final Passed
11/21/2023 ENGR Grading Final Not Ready
12/19/2023 ENGR Grading Final Passed