Permit: DP21-0002

Parcel: 11452008H

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
01/30/2024 ENGR Engineering Final Not Ready
07/23/2024 ENGR Engineering Final Passed
11/05/2025 ENGR Engineering Final Partial Pass I need to finish the walk-through on phase 1 and2A
11/06/2025 ENGR Engineering Final Partial Pass contractor needed to to replace some of the dead trees and Hydro seed the basins. in the common areas,And re-stake , the trees.
11/18/2025 ENGR Engineering Final Passed