Permit Details

Status:
Fees Due
Type:
Development Package
Address:
260 S CHURCH AV
Apply Date:
10/06/2020
Applicant:
Description:
Site/Grading/SWPPP - Tucson Convention Center improvements. Meeting rooms, parking garage, site impr

Permit Reviews

Permit Number - DP20-0205
Permit Status: Fees due
Permit Description: Site/Grading/SWPPP - Tucson Convention Center improvements. Meeting rooms, parking garage, site impr
Start Date Submittal Complete Date Status  
01/11/2022 REVISION - - 2ND 10/06/2022 COMPLETED Review Details
02/09/2021 DEV PKG - RESUBMITTAL 02/10/2021 COMPLETED Review Details
04/21/2021 DEV PKG - OK TO SUBMIT 05/04/2021 COMPLETED Review Details
05/04/2021 REVISION - - 1ST 08/17/2021 COMPLETED Review Details
09/01/2021 REVISION - - 1ST 12/29/2021 COMPLETED Review Details
10/06/2020 DEV PKG - OK TO SUBMIT 10/15/2020 COMPLETED Review Details
10/06/2022 DEV PKG - OK TO SUBMIT 10/11/2022 ACTIVE Review Details
10/15/2020 DEV PKG 12/17/2020 COMPLETED Review Details
12/29/2021 DEV PKG - OK TO SUBMIT 01/11/2022 COMPLETED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/02/2022 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Fees Due
Permit Number: DP20-0205
Permite Description: Site/Grading/SWPPP - Tucson Convention Center improvements. Meeting rooms, parking garage, site impr
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Fees Due
Permit Number: DP20-0205
Permit Description: Site/Grading/SWPPP - Tucson Convention Center improvements. Meeting rooms, parking garage, site impr
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/09/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 280 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.} ; {Activity date: 04/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 381 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.} ; {Activity date: 04/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 260 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.

}
07/18/2022 SITE - Zoning Final Passed {Activity date: 07/18/2022; Status: Approved; Inspector: RSALDAT1; Comment: Entered by RSALDAT1 - ALL ZONING INSPECTIONS COVERED UNDER BUILDING PERMIT.}
07/19/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/19/2022 ENGR Grading Final Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/19/2022 SITE - Stormwater Setup and Controls Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE FOR 280 S CHURCH AV} ; {Activity date: 07/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE FOR 260 S CHURCH AV} ; {Activity date: 07/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Please provide contact information when scheduling. Waddles installed. Concern is that excess of material piles are taller and within close proximity than Stormwater controls. Please monitor and correct as needed} ; {Activity date: 04/21/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 280 S CHURCH AV} ; {Activity date: 04/21/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 260 S CHURCH AV}
07/19/2022 COT - ENGR - Signage Final Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/21/2022 SITE - Stormwater Follow-up Passed {Activity date: 07/21/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO.
381 W CALLE CARLOS ARRUZA} ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO.

280 S CHURCH AV} ; {Activity date: 03/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO.

260 S CHURCH AV} ; {Activity date: 03/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ CONTRACTOR IS TAPING IN TOTHE EXISTING BOX CULVERT ONTHE SOUTH WEST SIDE OF THE BUILDING WITH A 18” R C P .ASK THE CONTRACTOR TO CUT THE REBAR AND STAY AWAY FROM THE R C P . SO IT NOT TOUCHING THE R C P..} ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME
381 W CALLE CARLOS ARRUZA} ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED, NO CONCERNS AT THIS TIME

280 S CHURCH AV} ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME

260 S CHURCH AV} ; {Activity date: 03/15/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/15/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - } ; {Activity date: 03/15/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME.

381 W CALLE CARLOS ARRUZA

} ; {Activity date: 03/10/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, LOOKED OVER THE AREAS WHERE ADDITIONAL CONTROLS HAVE BEEN REQUESTED BY MARTIN.
} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - NEED TI INSTALL WATTLES ON THE WEST SIDE OF PROJECT.

381 W CALLE CARLOS ARRUZA} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 260 S CHURCH AV, NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN FOR 381 W CALLE CARLOS ARRUZA/ WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY.} ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN FOR 280 S CHURCH AV / WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY.} ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN / WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY.} ; {Activity date: 04/16/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 381 W CALLE CARLOS ARRUZA AT THIS TIME, NO CONCERNS DURING THIS VISIT} ; {Activity date: 04/16/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 280 S CHURCH AVE AT THIS TIME, NO CONCERNS DURING THIS VISIT} ; {Activity date: 04/16/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 260 S CHURCH AV AT THIS TIME, NO CONCERNS DURING THIS VISIT}
07/21/2022 SITE - Stormwater Final Inspection Passed {Activity date: 07/21/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/29/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/29/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED
381 W CALLE CARLOS ARRUZA} ; {Activity date: 08/29/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED
280 S CHURCH AV} ; {Activity date: 08/29/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS APPROVED
260 S CHURCH AV} ; {Activity date: 08/18/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) PROVIDE REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE.
2) COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING ANOTHER INSPECTION.
3) REMOVE ALL EXCESS MATERIAL FROM THIS SITE, THIS WILL INCLUDE CONSTRUCTION AND LANDSCAPING ITEMS.
4) REMOVE ALL OF THE STORMWATER CONTROLS FROM THIS SITE, THIS WILL INSLUDE ALL OF THE WADDLE OR CONTROLS UTILIZED TO BLOCK THE WATER AT ALL THE CATCHBASINS EXISTING OR NEW.} ; {Activity date: 07/21/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PENDING THE COMPLETION OF THE LANDSCAPING FOR AL THE SITES AND THE PARKING LOT IMPROVEMENTS TO THE SOUTHERN EXTERIOR PARKING LOT.} ; {Activity date: 07/20/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - PARTIAL/ PENDING ON DAVID ROBERTS INSPECTION.THAT IS THE BUILDING AND LANDSCAPE.
THE PARKING LOT IS NOT READY FOR INSPECTION.}

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
REV-3 DEVELOPMENT PACKAGE, 31 PAGES.PDF PLANS UNDER REVIEW VIEW
REV-3 REVISION LETTER.PDF PLANS UNDER REVIEW VIEW
REV-3_ONLINE SUBMITTAL PAGE, RECVD 10.06.22.PDF PLANS UNDER REVIEW VIEW
TEP 2ND SUBMITTAL REDLINE PAGES, 02.03.21.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 02.03.21.PDF DOCUMENTS VIEW
TEP APPROVAL LETTER, 02.03.21.PDF DOCUMENTS VIEW
REVISION LETTER, 12.28.21.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 08.30.21.PDF DOCUMENTS VIEW
OWNER DRIVEN CHANGES LETTER, 04.19.21.PDF DOCUMENTS VIEW
LOT C SOILS REPORT ADDENDUM.PDF DOCUMENTS VIEW
LOT B SOILS REPORT ADDENDUM.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REVIEW COMMENT RESPONSE, 01.14.21.PDF DOCUMENTS VIEW
STRUCTURAL DETAIL-SIGNAGESHOWNONLANDSCAPEPLAN.PDF DOCUMENTS VIEW
ONLINE FILEDROP PAGE, RECVD. 01.14.21 AT 9;45AM.PDF DOCUMENTS VIEW
TDOT LANDSCAPE REVIEW, 12.10.20.PDF DOCUMENTS VIEW
TEP FACILITY MAP, 11.05.20.PDF DOCUMENTS VIEW
TEP REDLINE FOR DEV REVIEW, 11.05.20.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
NPP EXEMPTION REQUEST.PDF DOCUMENTS VIEW
SOILS REPORT LOT C GARAGE.PDF DOCUMENTS VIEW
SOILS REPORT MEETING ROOMS.PDF DOCUMENTS VIEW