Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/19/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/29/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by NGARCIA3 - APPROVED
381 W CALLE CARLOS ARRUZA |
| 08/29/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by NGARCIA3 - APPROVED
280 S CHURCH AV |
| 08/29/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by NGARCIA3 - IS APPROVED
260 S CHURCH AV |
| 08/18/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - 1) PROVIDE REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE.
2) COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING ANOTHER INSPECTION.
3) REMOVE ALL EXCESS MATERIAL FROM THIS SITE, THIS WILL INCLUDE CONSTRUCTION AND LANDSCAPING ITEMS.
4) REMOVE ALL OF THE STORMWATER CONTROLS FROM THIS SITE, THIS WILL INSLUDE ALL OF THE WADDLE OR CONTROLS UTILIZED TO BLOCK THE WATER AT ALL THE CATCHBASINS EXISTING OR NEW. |
| 07/21/2022 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PENDING THE COMPLETION OF THE LANDSCAPING FOR AL THE SITES AND THE PARKING LOT IMPROVEMENTS TO THE SOUTHERN EXTERIOR PARKING LOT. |
| 07/20/2022 |
PDSD Site/Engineering Division - Landscaping |
MHERNANDEZ |
Partial Approval |
Entered by VVERA1 - PARTIAL/ PENDING ON DAVID ROBERTS INSPECTION.THAT IS THE BUILDING AND LANDSCAPE.
THE PARKING LOT IS NOT READY FOR INSPECTION. |