Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0205
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
07/19/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
04/07/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - IS PARTIAL AT THIS TIME, OK FOR TCO PENDING ALL OTHER INSPECTIONS AND REMOVAL OF CONSTRUCTION FENCE MATERIAL LOCATED SOUTH WEST OF THE MAIN ENTRANCE INTO THE EXISTING FACILITY NORTH OF THE NEW EXHIBIT HALLS. 260 S CHURCH AV |
04/07/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN / THE T C O OK .FINAL PENDING OTHER INSPECTION. 381 W CALLE CARLOS ARRUZA |
04/07/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN / THE T C O OK .FINAL PENDING OTHER INSPECTION. 280 S CHURCH AV |
04/06/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN /THERE ARE STILL WORKING ON INSTALLING THE FENCE AND BARRICADES. WILL SEND ME PHOTO WHEN THERE ARE FINSH. NEED TO RESCHEDULE FOR WALK THROUGH TOMORROW MORNING AT 7:30 AM . |
04/21/2021 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN / CONTRACTOR DID NOT CALL FOR INSPECTION ONTHE STORM DRAIN CONTROLS . |
04/20/2021 | ENGR Engineering Final | AHINES2 | Prior to Final Inspectn | Entered by AHINES2 - Fees must be paid prior to Final inspection. See fee calculation comment in system. |
08/18/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - 1) PROVIDE REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE TO THIS SITE. 2) COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING ANOTHER INSPECTION. 3) REMOVE ALL EXCESS MATERIAL FROM THIS SITE, THIS WILL INCLUDE CONSTRUCTION AND LANDSCAPING ITEMS. 4) REMOVE ALL OF THE STORMWATER CONTROLS FROM THIS SITE, THIS WILL INSLUDE ALL OF THE WADDLE OR CONTROLS UTILIZED TO BLOCK THE WATER AT ALL THE CATCHBASINS EXISTING OR NEW. |
11/03/2022 | ENGR Engineering Final | Passed | NO COMMENTS PERMIT IS FULL APPROVED |