Permit: DP20-0205

Parcel: 11720029A


Addresses:

260 S CHURCH AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP20-0205

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
07/07/2022 ENGR Grading Final DROBERTS Approved Entered by NGARCIA3 - APPROVED 381 W CALLE CARLOS ARRUZA
07/07/2022 ENGR Grading Final DROBERTS Approved Entered by NGARCIA3 - APPROVED 280 S CHURCH AV
07/07/2022 ENGR Grading Final DROBERTS Approved Entered by NGARCIA3 - APPROVED 260 S CHURCH AV
07/05/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN NO CONTRACTOR ON SITE NEED TO RESCHEDULE
03/31/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN/ THE T C OF O. WILL BE GIVING PENDING THE INSPECTION ON WEDNE 381 W CALLE CARLOS ARRUZA
03/31/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN/ THE T C OF O. WILL BE GIVING PENDING THE INSPECTION ON WEDNESDAY. 280 S CHURCH AV
03/31/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN/ THE T C OF O. WILL BE GIVING PENDING THE INSPECTION ON WEDNE 260 S CHURCH AV
07/19/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
07/19/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
07/19/2022 ENGR Grading Final Passed {Activity date: 07/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED AT THIS TIME. I MET WITH ERIC/SUNDT TO LOOK AT THE DRAINAGE TIE-IN INTO THE EXISTING DRAINAGE CHANNEL THAT RUNS EAST TO WEST ALONG THE SOUTH SIDE OF THE NEW PARKING STRUCTURE/GARAGE. THEY HAVE CUT AN OPENING INTO THE STRUCTURE AND ARE GOING TO INSTALL AN 18 INCH RCP DRAIN PIPE THROUGH THE SIDE WALL. AFTER I HAD LOOKED AT THE OPENING THAT THEY HAVE ALREADY CUT AND THE PLAN DETAILS I ADVISED THEM THAT THIS COULD NOT BE DONE AT THIS TIME. THE OPENING INTO THE STRUCTURE IS 24 INCHS ON ALL SIDES, PER THE PLANS IT NEEDS TO BE 28 INCHES IN ALL SUDES TO ALLOW FOR 3 INSHES OUTSIDE THE PIPE ON ALL SIDES. THE EXTERIOR OF THE PIPE MEASURES 22 INCHES ACROSS THE PIPE AND THEY 6 INCHES OF CLEAR SPACE FOR THE NON-SHRINKABLE GROUT THAT WILL BE PLACED TO SECURE THE PIPE WITHIN THE OPENING. THEY WILL RESCHEDULE THIS INSPECTION THE HOLE IS AT THE CORRECT DIMENSION AND THEY HAVE COMPLETED PLACING THE 16 #5 BARS IN EPOXY FILLED HOLES THAT ARE 3 INCHES DEEP.
381 W CALLE CARLOS ARRUZA} ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED AT THIS TIME. I MET WITH ERIC/SUNDT TO LOOK AT THE DRAINAGE TIE-IN INTO THE EXISTING DRAINAGE CHANNEL THAT RUNS EAST TO WEST ALONG THE SOUTH SIDE OF THE NEW PARKING STRUCTURE/GARAGE. THEY HAVE CUT AN OPENING INTO THE STRUCTURE AND ARE GOING TO INSTALL AN 18 INCH RCP DRAIN PIPE THROUGH THE SIDE WALL. AFTER I HAD LOOKED AT THE OPENING THAT THEY HAVE ALREADY CUT AND THE PLAN DETAILS I ADVISED THEM THAT THIS COULD NOT BE DONE AT THIS TIME. THE OPENING INTO THE STRUCTURE IS 24 INCHS ON ALL SIDES, PER THE PLANS IT NEEDS TO BE 28 INCHES IN ALL SUDES TO ALLOW FOR 3 INSHES OUTSIDE THE PIPE ON ALL SIDES. THE EXTERIOR OF THE PIPE MEASURES 22 INCHES ACROSS THE PIPE AND THEY 6 INCHES OF CLEAR SPACE FOR THE NON-SHRINKABLE GROUT THAT WILL BE PLACED TO SECURE THE PIPE WITHIN THE OPENING. THEY WILL RESCHEDULE THIS INSPECTION THE HOLE IS AT THE CORRECT DIMENSION AND THEY HAVE COMPLETED PLACING THE 16 #5 BARS IN EPOXY FILLED HOLES THAT ARE 3 INCHES DEEP.
CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 03/17/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED AT THIS TIME. I MET WITH ERIC/SUNDT TO LOOK AT THE DRAINAGE TIE-IN INTO THE EXISTING DRAINAGE CHANNEL THAT RUNS EAST TO WEST ALONG THE SOUTH SIDE OF THE NEW PARKING STRUCTURE/GARAGE. THEY HAVE CUT AN OPENING INTO THE STRUCTURE AND ARE GOING TO INSTALL AN 18 INCH RCP DRAIN PIPE THROUGH THE SIDE WALL. AFTER I HAD LOOKED AT THE OPENING THAT THEY HAVE ALREADY CUT AND THE PLAN DETAILS I ADVISED THEM THAT THIS COULD NOT BE DONE AT THIS TIME. THE OPENING INTO THE STRUCTURE IS 24 INCHS ON ALL SIDES, PER THE PLANS IT NEEDS TO BE 28 INCHES IN ALL SUDES TO ALLOW FOR 3 INSHES OUTSIDE THE PIPE ON ALL SIDES. THE EXTERIOR OF THE PIPE MEASURES 22 INCHES ACROSS THE PIPE AND THEY 6 INCHES OF CLEAR SPACE FOR THE NON-SHRINKABLE GROUT THAT WILL BE PLACED TO SECURE THE PIPE WITHIN THE OPENING. THEY WILL RESCHEDULE THIS INSPECTION THE HOLE IS AT THE CORRECT DIMENSION AND THEY HAVE COMPLETED PLACING THE 16 #5 BARS IN EPOXY FILLED HOLES THAT ARE 3 INCHES DEEP.
260 S CHURCH AV} ; {Activity date: 03/10/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED AT THIS TIME. MOST OF THE SITE WORK IS FOR THE STRUCTURE, MINOR AMOUNTS ON THE SITE. TDOT WILL BE INSPECTING MOST OF THE SITE WORK THAT IS HAPPENING SINCE IT IS WITHIN THE RIGHT OF WAY.

} ; {Activity date: 03/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN

381 W CALLE CARLOS ARRUZA} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ NO CONCERNS AS OF TODAY.

280 S CHURCH AV} ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ NO CONCERNS AS OF TODAY.

260 S CHURCH AV} ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN FOR 381 W CALLE CARLOS ARRUZA/THE FOURTH ISLAND IN THE PARKING LOT IS GOOD TO PLACE D.G} ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN FOR 280 S CHURCH AV/THE FOURTH ISLAND IN THE PARKING LOT IS GOOD TO PLACE D.G} ; {Activity date: 04/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN FOR 260 S CHURCH AV/THE FOURTH ISLAND IN THE PARKING LOT IS GOOD TO PLACE D.G

} ; {Activity date: 04/26/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 280 S CHURCH AV AT THIS TIME. MET WITH THE CONTRACTORS SUNDT, CONCORD, AND MAGNUM PAVING, AND WE RECALIBRATED ALL LEVELS AND CHECKED THE WESTERN 5 PARKING SPACES AND 3 ACCESS AISLES FOR COMPLIANCE. ALL CHECKED TO BE IN COMPLIANCE OF 2% OR LESS AT THIS TIME, THE ADA PARKING SPACES FOR PARKING LOT B HAVE BEEN APPROVED FOR USE.} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, WORK IN PARKING LOTB AREA IS MAINLY VERTICAL WORK ON THE BUILDING. I CHECKED SOME OF THE ADA PARKING SPACES AND ACCESS AISLES FOR COMPLIANCE. IT HAS BEEN NOTED DURING THIS INSPECTION THAT THE WETERN 5 SPACES AND ACCESS AISLES APPEAR TO BE NON COMPLIANT, THEY EXCEED THE MAXIMUM ALLOWABLE 2% GRADE. THE CONTRACTOR HAS BEEN ADVISED THAT THESE WILL HAVE TO BE COMPLIANT PRIOR TO THE CLOSURE OF THIS PERMIT.

IN PARKING LOT C THE CREWS ARE WORKING ON UTILITY INSTALLATION AND GRADING OF THE SITE FOR SUB-GRADE.

} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, WORK IN PARKING LOTB AREA IS MAINLY VERTICAL WORK ON THE BUILDING. I CHECKED SOME OF THE ADA PARKING SPACES AND ACCESS AISLES FOR COMPLIANCE. IT HAS BEEN NOTED DURING THIS INSPECTION THAT THE WETERN 5 SPACES AND ACCESS AISLES APPEAR TO BE NON COMPLIANT, THEY EXCEED THE MAXIMUM ALLOWABLE 2% GRADE. THE CONTRACTOR HAS BEEN ADVISED THAT THESE WILL HAVE TO BE COMPLIANT PRIOR TO THE CLOSURE OF THIS PERMIT.

IN PARKING LOT C THE CREWS ARE WORKING ON UTILITY INSTALLATION AND GRADING OF THE SITE FOR SUB-GRADE.} ; {Activity date: 04/23/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 260 S CHURCH AV, WORK IN PARKING LOTB AREA IS MAINLY VERTICAL WORK ON THE BUILDING. I CHECKED SOME OF THE ADA PARKING SPACES AND ACCESS AISLES FOR COMPLIANCE. IT HAS BEEN NOTED DURING THIS INSPECTION THAT THE WETERN 5 SPACES AND ACCESS AISLES APPEAR TO BE NON COMPLIANT, THEY EXCEED THE MAXIMUM ALLOWABLE 2% GRADE. THE CONTRACTOR HAS BEEN ADVISED THAT THESE WILL HAVE TO BE COMPLIANT PRIOR TO THE CLOSURE OF THIS PERMIT.

IN PARKING LOT C THE CREWS ARE WORKING ON UTILITY INSTALLATION AND GRADING OF THE SITE FOR SUB-GRADE.

Drop to add an attachment
Attachments} ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 381 W CALLE CARLOS ARRUZA} ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/16/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED FOR 381 W CALLE CARLOS ARRUZA AT THIS TIME, THE CREWS ARE WORKING ON THE FOLLOWING ITEMS: 1) AT THE TCC ON THE EAST SIDE OF PARKING LOT B THEY CONTINUE THE GRADING AND UTILITY WORK. 2) MINOR SURFACE WORKING ON THE WESTERN PORTION OF PARKING LOT B, PREPPING FOR THE PLANT