Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP20-0205
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2021 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by RSALDAT1 - 280 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION. |
04/09/2021 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by RSALDAT1 - 381 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION. |
04/09/2021 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by RSALDAT1 - 260 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION. |