260 S CHURCH AV


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP20-0205

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
04/09/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by RSALDAT1 - 280 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.
04/09/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by RSALDAT1 - 381 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.
04/09/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by RSALDAT1 - 260 APPROVED. WALKED THE SITE WITH LYLE FROM SUNDT CONSTRUCTION AND LOOKED AT THE WORK THAT THEY HAVE BEEN DOING IN PARKING LOT B AND C OVER THE PAST FEW WEEKS. THE PERMIT NEEDS TO BE PLACED INTO ISSUED STATUS SO THAT THE CONTRACTOR CAN CALL IN THEIR OWN INSPECTIONS IN THE FUTURE. I HAVE ALSO ADVISED LYLE THAT WE HAVE NOT INSPECTED ANY OF THE WORK THAT HAS HAPPENED PRIOR TO THIS DATE. FOR THIS WORK THEY WILL HAVE TO GET ME A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL WORKED THAT IS COMPLETED. THIS WILL INCLUDE BUT IS NOT LIMITED TO PARKING LOT B PAVEMENT, CURBS, SIDEWALK, HANDICAP ACCESS AISLES AND PARKING SPACES, AND LANDSCAPING ITEMS THAT HAVE BEEN COMPLETED. WE ALSO DROVE OVER TO LOOK AT WHAT WORK THAT THEY ARE DOING IN THE PARKING LOT C LOCATION.