Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP20-0205
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/19/2022 | SITE - Stormwater Setup and Controls | DROBERTS | Approved | Entered by DROBERT5 - |
07/23/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by VLEON1 - CONTINUE FOR 280 S CHURCH AV |
07/23/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by VLEON1 - CONTINUE FOR 260 S CHURCH AV |
07/23/2021 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Please provide contact information when scheduling. Waddles installed. Concern is that excess of material piles are taller and within close proximity than Stormwater controls. Please monitor and correct as needed |
04/21/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 280 S CHURCH AV |
04/21/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 260 S CHURCH AV |