Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP20-0205
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/21/2022 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
03/23/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO. 381 W CALLE CARLOS ARRUZA |
03/23/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO. 280 S CHURCH AV |
03/23/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/ COMPLETED THE INSTALLATION OF THE 18" R C P .AND FORMING FOR THE CATCH BASIN THRER ALSO. 260 S CHURCH AV |
03/22/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VVERA1 - CN/ CONTRACTOR IS TAPING IN TOTHE EXISTING BOX CULVERT ONTHE SOUTH WEST SIDE OF THE BUILDING WITH A 18” R C P .ASK THE CONTRACTOR TO CUT THE REBAR AND STAY AWAY FROM THE R C P . SO IT NOT TOUCHING THE R C P.. |
03/17/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 381 W CALLE CARLOS ARRUZA |
03/17/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - CONTINUED, NO CONCERNS AT THIS TIME 280 S CHURCH AV |
03/17/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME 260 S CHURCH AV |
03/15/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by RSALDAT1 - |
03/15/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by RSALDAT1 - |
03/15/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME. 381 W CALLE CARLOS ARRUZA |
03/10/2022 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VVERA1 - IS CONTINUED, LOOKED OVER THE AREAS WHERE ADDITIONAL CONTROLS HAVE BEEN REQUESTED BY MARTIN. |
02/23/2022 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by NGARCIA3 - NEED TI INSTALL WATTLES ON THE WEST SIDE OF PROJECT. 381 W CALLE CARLOS ARRUZA |
04/23/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION. |
04/23/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION. |
04/23/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 260 S CHURCH AV, NO CONCERNS NOTED DURING THIS INSPECTION. |
04/22/2021 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 381 W CALLE CARLOS ARRUZA/ WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY. |
04/22/2021 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 280 S CHURCH AV / WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY. |
04/22/2021 | SITE - Stormwater Follow-up | MHERNANDEZ | Continued | Entered by VLEON1 - CN / WAITING FOR A LATTER FROME THE ENGINEER OF RECORD TO WHAT BEEN INSTALLED AS OF TODAY. |
04/16/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 381 W CALLE CARLOS ARRUZA AT THIS TIME, NO CONCERNS DURING THIS VISIT |
04/16/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 280 S CHURCH AVE AT THIS TIME, NO CONCERNS DURING THIS VISIT |
04/16/2021 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 260 S CHURCH AV AT THIS TIME, NO CONCERNS DURING THIS VISIT |