Permit: DP19-0084
Permit Details
Status:
Complete
Type:
Development Package
Address:
1701 W SAINT MARYS RD
Address NEW:
1701 W SAINT MARYS RD
Apply Date:
04/04/2019
Applicant:
Description:
SITE/GRADING/SWPPP - St. Mary's Hospital, new medical office building, two-story.
Permit Reviews
Permit Number - DP19-0084
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - St. Mary's Hospital, new medical office building, two-story.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2019 | DEV PKG - OK TO SUBMIT | 04/08/2019 | COMPLETED |
| 04/09/2019 | DEV PKG - OK TO SUBMIT | 04/15/2019 | COMPLETED |
| 04/15/2019 | DEV PKG | 05/13/2019 | COMPLETED |
| 05/08/2020 | DEV PKG - OK TO SUBMIT | 06/10/2020 | COMPLETED |
| 06/07/2019 | DEV PKG - RESUBMITTAL | 07/10/2019 | COMPLETED |
| 06/10/2020 | REVISION - - 2ND | 06/19/2020 | COMPLETED |
| 08/16/2019 | DEV PKG - OK TO SUBMIT | 09/26/2019 | COMPLETED |
| 09/26/2019 | DEV PKG - REVISION | 10/24/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0084
Permit Description: SITE/GRADING/SWPPP - St. Mary's Hospital, new medical office building, two-story.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Dan with Barker Morrissey, at 909-2300. Perry engineering at 620-9870, desert earth contracting. Project consists of a new building, demoingThe old building and creating new parking areas and a double trash enclosure. A SWPpp It’s not specified. Native plants r not to be saved. Please schedule stormwater follow up inspections on a regular basis and provide controls as needed. Temporary parking and temporary fencing has been installed. } ; {Activity date: 09/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Dan at 909-2300 will reschedule for preconstruction meeting.} |
|
| 07/01/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/01/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} | |
| 01/26/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 01/26/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 07/16/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy of building as shown for phase 1 of construction. Two accessible parking spaces are out of compliance and require correction. Then accessible parking signs have not been installed. Landscaping has not yet been installed.} | |
| 04/08/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 02/11/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Minor check out on private street small amounts of dirt against curb. Irrigation lines been dug. No activity on site at this time.} ; {Activity date: 01/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE MINOR TRACK OUT NOTED ALONG WITH DIRT ALONG CURB ON CONTINENTAL DR NO ACTIVITY ON SITE AFTER RAIN EVENT} ; {Activity date: 01/22/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE THERE ARE NO ISSUES AT THIS TIME. FINAL GRADING IN PROGRESS} ; {Activity date: 01/07/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Minor track out in private drive only. No controls in place. Final grading in progress.} ; {Activity date: 12/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. No issues after rain event. Silt fencing installed at West perimeter} ; {Activity date: 12/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues at this time. Temporary perimeter fencing for phase 2 has been installed } ; {Activity date: 10/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued } ; {Activity date: 09/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Trackout is contained within private drive.} ; {Activity date: 09/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Material and debris stock piles remain at northwest corner of site} ; {Activity date: 08/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - continued material stock piles in parking area} ; {Activity date: 07/31/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Dan with Barker Morrissey, please install storm water controls along the north west portion of the site as previously requested.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. } ; {Activity date: 06/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time.} ; {Activity date: 05/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued no issues} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues, check out is contained within the site.} ; {Activity date: 11/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Walk to site, protections are in place. No issues at this time.} ; {Activity date: 11/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I’ll track out is contained within the parking lot } ; {Activity date: 10/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Please schedule inspections as required.} ; {Activity date: 09/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - There are no issues at this time. Contractor is sweeping as needed. } |
|
| 04/09/2021 | ENGR Grading Final | Passed | {Activity date: 04/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09183, 09186, 09172, 09174, 09160. Approved} | |
| 04/09/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09183, 09186, 09172, 09174, 09160. Approved} | |
| 04/28/2021 | ENGR Engineering Final | Passed | {Activity date: 04/28/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - Approved. Dan with Barker Morrissey will ensure the SWPPP permit has been terminated by the state of Arizona.} ; {Activity date: 04/08/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Terminate SWPPP permit. Remove loose dirt next to curbs. Schedule all remaining inspections for final approval. } ; {Activity date: 09/10/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Long-term bicycle parking has been installed} ; {Activity date: 07/30/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Phase 1 OK for temporary certificate of occupancy} ; {Activity date: 07/16/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy of building as shown for phase 1 of construction. Two accessible parking spaces are out of compliance and require correction. Then accessible parking signs have not been installed. Landscaping has not yet been installed.} ; {Activity date: 07/01/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues at this time } ; {Activity date: 09/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Dan at 909-2300 will reschedule for preconstruction meeting.} |
|
| 05/18/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 03/25/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - PARTIAL APPROVAL} ; {Activity date: 07/21/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Trees need to be properly staked. Landscapers in the process of removing construction debris and preparing for final ground covering for phase 1.} | |
| 05/18/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/18/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Silt fencing has been removed for grading activities} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Temporary perimeter fencing has been installed for phase 2} ; {Activity date: 09/08/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Partially approved. Silt fencing has been repaired. Dan with Barker} ; {Activity date: 09/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Sup fencing has been damaged in a few locations} ; {Activity date: 08/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Sell fencing installed along west and north perimeter.} ; {Activity date: 07/31/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Dan with Barker Morrissey, please install storm water controls along the north west portion of the site as previously requested.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Please Install controls along north side of sight as needed. NOTE INSPECTOR PREVIOUSLY AP BUT DID NOT COMPLETE CONTROLS.} ; {Activity date: 07/01/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - } |