Permit: DP19-0084

Parcel: 11615087D

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/08/2021 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 -
03/19/2021 ENGR Engineering Final BBENEDON Denied Entered by VLEON1 - Denied. Unscheduled inspection. Landscaped islands along the eastern portion of the new parking area require correction. As well as inlets into the north basin. Dan with Barker
03/18/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 -
12/24/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Work in progress.
07/16/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy of building as shown for phase 1 of construction. Two accessible parking spaces are out of compliance and require correction. Then accessible parking signs have not been installed. Landscaping has not yet been installed.
04/28/2021 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - Approved. Dan with Barker Morrissey will ensure the SWPPP permit has been terminated by the state of Arizona.
04/08/2021 ENGR Engineering Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Terminate SWPPP permit. Remove loose dirt next to curbs. Schedule all remaining inspections for final approval.
09/10/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Long-term bicycle parking has been installed
07/30/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Phase 1 OK for temporary certificate of occupancy
07/16/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Engineering has no issues that would prevent a temporary certificate of occupancy of building as shown for phase 1 of construction. Two accessible parking spaces are out of compliance and require correction. Then accessible parking signs have not been installed. Landscaping has not yet been installed.
07/01/2020 ENGR Engineering Final BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues at this time
09/09/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Dan at 909-2300 will reschedule for preconstruction meeting.