Permit: DP19-0084

Parcel: 11615087D

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
05/18/2021 SITE - Stormwater Setup and Controls DROBERTS Approved Entered by DROBERT5 -
12/15/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - . Silt fencing has been removed for grading activities
10/08/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by VFLORES1 - Temporary perimeter fencing has been installed for phase 2
09/08/2020 SITE - Stormwater Setup and Controls BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Silt fencing has been repaired. Dan with Barker
09/03/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - Continued. Sup fencing has been damaged in a few locations
08/05/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - Continued. Sell fencing installed along west and north perimeter.
07/31/2020 SITE - Stormwater Setup and Controls BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Dan with Barker Morrissey, please install storm water controls along the north west portion of the site as previously requested.
07/16/2020 SITE - Stormwater Setup and Controls BBENEDON Continued Entered by RSALDAT1 - Continue. Please Install controls along north side of sight as needed. NOTE INSPECTOR PREVIOUSLY AP BUT DID NOT COMPLETE CONTROLS.
07/01/2020 SITE - Stormwater Setup and Controls BBENEDON Approved Entered by RSALDAT1 - Approved
09/19/2019 SITE - Stormwater Setup and Controls BBENEDON Not ready for Inspection Entered by VFLORES1 -