Permit: DP19-0084

Parcel: 11615087D

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - Landscaping

Date Description Inspector Results Comments
04/08/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by VLEON1 -
03/11/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by VLEON1 - PARTIAL APPROVAL TREE STAKING
03/03/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Small plants. Provide staking of trees and ground coverings as specified
02/04/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by VLEON1 - PARTIAL APPROVAL, IRRIGATION AT NORTH PARKING AREA
08/12/2020 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by RSALDAT1 - partially approved. Ground covering south perimeters
08/05/2020 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved Plants installed. Phase 1. Ground covering has not yet been installed.
05/18/2021 PDSD Site/Engineering Division - Landscaping DROBERTS Approved Entered by DROBERT5 -
03/25/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by VLEON1 -
03/25/2021 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by VLEON1 - PARTIAL APPROVAL
07/21/2020 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Trees need to be properly staked. Landscapers in the process of removing construction debris and preparing for final ground covering for phase 1.