Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/19/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by VFLORES1 - Dan with Barker Morrissey, at 909-2300. Perry engineering at 620-9870, desert earth contracting. Project consists of a new building, demoingThe old building and creating new parking areas and a double trash enclosure. A SWPpp It’s not specified. Native plants r not to be saved. Please schedule stormwater follow up inspections on a regular basis and provide controls as needed. Temporary parking and temporary fencing has been installed.
|
| 09/09/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Dan at 909-2300 will reschedule for preconstruction meeting. |