Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
05/02/2018
Applicant:
Lisa Bowers
Description:
E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8

Permit Reviews

Permit Number - DP18-0104
Permit Status: Issued
Permit Description: E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8
Start Date Submittal Complete Date Status  
02/11/2019 DEV PKG - REVISION 03/07/2019 COMPLETED Review Details
04/30/2018 DEV PKG - OK TO SUBMIT 05/02/2018 COMPLETED Review Details
05/02/2018 DEV PKG 06/08/2018 COMPLETED Review Details
06/22/2018 DEV PKG - RESUBMITTAL 07/23/2018 COMPLETED Review Details
07/25/2018 DEV PKG - RESUBMITTAL 07/26/2018 COMPLETED Review Details
12/04/2018 DEV PKG - REVISION 12/17/2018 COMPLETED Review Details
12/21/2018 DEV PKG - REVISION 12/27/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP18-0104
Permit Status: Issued
Permit Description: E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8
Total Outstanding Activity Conditions - 1
Date Name
07/20/2018 Pima County Regional Flood Control District (RFCD)requires an inspection of the connection point from the private stormdrain overflow pipe to RFCD maintained infrastructure.Reference Storm Drain keynotes on DP18-0104 sheets 8, 9 and 10

Outstanding Inspections

Permit Status: Issued
Permit Number: DP18-0104
Permite Description: E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/06/2019 SITE - Stormwater Final Inspection N/A Complete (Recurring) {Activity date: 11/06/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE WORK FOR THIS SITE AND REMOVE THE STORMWATER CONTROLS AS NEEDED. PROVIDE US THE FOLLOWING ITEMS WHEN THIS SITE IS READY FOR THE FINAL INSPECTION: 1) THE N.O.T. FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, 2) A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THIS SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS, AND THAT HE HAS VERIFIED THAT ALL ITEMS THAT WERE NOT INSPECTED BY THE CITY ARE PER CODE. 3) PROVIDE THE CITY A FULL SET OF THE APPROVED REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE DURING CONSTRUCTION. THESE WILL BE UTILIZED FOR THE FINAL INSPECTION, IF NOTHING HAS CHANGED THE ORIGINAL DRAWINGS WILL BE REQUIRED,} ; {Activity date: 08/27/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls are still in place.
}
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP18-0104
Permit Description: E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8
Total Completed Inspections - 7
Date Description Inspector Results Comments
07/31/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/31/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED THE EXPECTATIONS OF THIS PROJECT. THEY HAVE BEEN ADVISED THAT WE WILL NEED TO INSPECT ANY MATERIAL THAT IS TO BE PLACED UNDERGROUND PRIOR TO THE PLACEMENT OF BACKFILL MATERIAL.}
07/09/2019 SITE - Stormwater Follow-up Passed {Activity date: 07/09/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is work being performed at jobsite entrances, check out protection has been removed.
} ; {Activity date: 05/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Martin Luther King Jr. Way is closed down at this time. There are no stormwater control issues.
} ; {Activity date: 04/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues or concerns at this time.Minor track out noted on ML King Junior Way and on Tucson marketplace.} ; {Activity date: 03/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is quite a bit of a track out on Martin Luther King Way} ; {Activity date: 02/28/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - I spoke with the general contractor about correcting the track out protection and cleaning the streets
} ; {Activity date: 02/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time.
} ; {Activity date: 02/20/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - T%here is quite a bit of dirt on the streets, however the large chunks have been swept} ; {Activity date: 01/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - My only concern is the existing catch basin on the far west side at the HDPE connection, protecting contain dirt prior to this evening’s rain to prevent dirt from filling catch basin.} ; {Activity date: 01/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Some track out onto MLK JR way.} ; {Activity date: 01/22/2019; Status: Correction Required; Inspector: BBENEDON; Comment: Entered by VFLORES1 - No concerns at this time.} ; {Activity date: 01/18/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Miner track out noted} ; {Activity date: 01/17/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Miner track out noted} ; {Activity date: 01/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time, I suggest adding some rock at the 2in open drain pipe on the West End prior to tonight's rain.} ; {Activity date: 01/08/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO REAL CONCERNS AT THIS TIME. THE CONTRACTOR HAS BEEN ADVISED TO CLEANUP THE MINOR TRACKOUT NOTED ON M L KING JR WAY, THIS WILL START TONIGHT WHEN THE SWEEPERS ARE AVAILABLE.}
11/05/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/05/2019 ENGR Grading Final Passed {Activity date: 11/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/05/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 11/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Check out protection has been installed at the new job site entrance.} ; {Activity date: 07/31/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CONTRACTOR HAS STARTED PLACING THEIR STORMWATER CONTROLS BUT STILL NEED TO PLACE THE TRACKOUT MATERIAL AS NEEDED THROUGHOUT THE SITE.}
11/05/2019 COT - ENGR - Signage Final Passed {Activity date: 11/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/13/2021 ENGR Engineering Final Passed {Activity date: 05/13/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 11/06/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE WORK FOR THIS SITE AND REMOVE THE STORMWATER CONTROLS AS NEEDED. PROVIDE US THE FOLLOWING ITEMS WHEN THIS SITE IS READY FOR THE FINAL INSPECTION: 1) THE N.O.T. FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, 2) A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THIS SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS, AND THAT HE HAS VERIFIED THAT ALL ITEMS THAT WERE NOT INSPECTED BY THE CITY IS PER CODE. 3) PROVIDE THE CITY A FULL SET OF THE APPROVED REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE DURING CONSTRUCTION. THESE WILL BE UTILIZED FOR THE FINAL INSPECTION, IF NOTHING HAS CHANGED THE ORIGINAL DRAWINGS WILL BE REQUIRED,} ; {Activity date: 10/03/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Jim the general contractor for the Geico project about the stormwater controls that were left in place which caused erosion along the west property line. I informed him that all the work for the development package permit for this site needs to be inspected prior to building final.}

Documents

File Name Document Type  
1-28 OF 28.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION JOB CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CONTRACTOR LETTER OF RECORD 07.20.18.PDF DOCUMENTS VIEW
DUST CONTROL PERMIT.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
CIVIL_RESPONSE.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
COMMENT_RESPONSE.PDF DOCUMENTS VIEW
REV1_2ND CIVIL_RESPONSE.PDF DOCUMENTS VIEW
REV1_2ND LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
REV1_ACCESS_EASEMENT.PDF DOCUMENTS VIEW
REV1_DRAINAGE_ADDENDUM.PDF DOCUMENTS VIEW
REV1_REVISION_LETTER.PDF DOCUMENTS VIEW
REV-2_REVISION LETTER.PDF DOCUMENTS VIEW
NOBEL WAY HYDRO REPORT 2011-03-21.PDF DOCUMENTS VIEW