Permit: DP18-0104

Parcel: 132130680

Inspection Status: Not Ready

Inspection History: PDSD Site/Engineering Division - Landscaping

Permit Number - DP18-0104

Inspection Description - PDSD Site/Engineering Division - Landscaping

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
05/13/2021 PDSD Site/Engineering Division - Landscaping MHERNANDEZ Partial Approval Entered by VLEON1 - PARTIAL THERE IS ONE PLANT MISSING
11/06/2019 PDSD Site/Engineering Division - Landscaping DROBERTS Partial Approval Entered by DROBERT5 - COMPLETE ALL THE LANDSCAPING FOR THI SITE PRIOR TO CALLING IN ANOTHER INSPECTION, THIS WILL INCLUDE THE FOLLOWING BUT IS NOT LIMITED TO: 1) ENSURE ALL PLANTS HAVE BEEN INSTALLED, PORTIONS OF THE SITE WILL BE CHECKED AGAINST THE APPROVED PLANS. 2) COMPLETE THE PLACEMENT OF ALL ROCK RIP AND DECOMPOSED GRANITE AS SHOWN ON THE APPROVED PLANS. 3) ENSURE THAT ALL OF THE TREES HAVE BEEN STAKED AS SHOWN ON THE APPROVED PLANS. IT HAS BEEN NOTED AT THIS TIME THERE ARE TREES THROUGHOUT THE SITE THAT STILL HAVE THE NURSARY STAKES OR JUST A SINGLE POLE STAKE.IF STAKING OF A PLANT IS REQUIRED FOR A TREE IT MUST BE DONE IN THE MANNER THAT IS SHOWN ON THE LANDSCAPE DETAILS FOR TREE STAKING. 4) PROVIDE A MONITORING LETTER FROM THE LANDSCAPE ARCHITECT FOR ANY/ALL CHANGES TO THE SITE IN REGARDS TO THE NPPO.
07/09/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by DMERANZ1 -
06/24/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Continued Entered by DMERANZ1 - Contractor is landscaping in the areas close to the building main entrance. 09027 engineering final inspection. Not ready. Engineering has no issues preventing a TCO
05/14/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by DMERANZ1 - no landscaping has been installed at this time.
11/06/2019 PDSD Site/Engineering Division - Landscaping DROBERTS Approved Entered by DROBERT5 -
11/06/2019 PDSD Site/Engineering Division - Landscaping DROBERTS Continued Entered by DROBERT5 - COMPLETE ALL OF THE LANDSCAPING AS SHOWN ON THE APPROVED PLANS. THIS WILL ALSO INCLUDE THE PROPER STAKING OF ALL THE TREES, VERIFYING THAT ALL OF THE PLANTS HAVE BEEN INSTALLED AND ARE VIABLE, INSTALLATION OF ALL OF THE RIP RAP, AND THE SPRAYING OF HYDROSEED IN ALL DISTURBED AREAS ALONG THE OUTER PERIMETERS.
08/27/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Continued Entered by DMERANZ1 - Contractor is installing landscaping and riprap along the west and north perimeter’s of the site.
08/20/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Continued Entered by DMERANZ1 - Contractor is installing landscaping and riprap along south property line.
07/12/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by DMERANZ1 - Contractor is installing landscaping in the south half of the site. Islands have been depressed as required and riprap has been installed at curb openings.