Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0104
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2021 | ENGR Engineering Final | MHERNANDEZ | Approved | Entered by VLEON1 - |
11/06/2019 | ENGR Engineering Final | DROBERTS | Continued | Entered by DROBERT5 - COMPLETE ALL OF THE WORK FOR THIS SITE AND REMOVE THE STORMWATER CONTROLS AS NEEDED. PROVIDE US THE FOLLOWING ITEMS WHEN THIS SITE IS READY FOR THE FINAL INSPECTION: 1) THE N.O.T. FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, 2) A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THIS SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS, AND THAT HE HAS VERIFIED THAT ALL ITEMS THAT WERE NOT INSPECTED BY THE CITY IS PER CODE. 3) PROVIDE THE CITY A FULL SET OF THE APPROVED REVISED DRAWINGS FOR ALL OF THE CHANGES THAT HAVE BEEN MADE DURING CONSTRUCTION. THESE WILL BE UTILIZED FOR THE FINAL INSPECTION, IF NOTHING HAS CHANGED THE ORIGINAL DRAWINGS WILL BE REQUIRED, |
10/03/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I spoke with Jim the general contractor for the Geico project about the stormwater controls that were left in place which caused erosion along the west property line. I informed him that all the work for the development package permit for this site needs to be inspected prior to building final. |
11/05/2019 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/03/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I spoke with Jim the general contractor for the Geico project about the stormwater controls that were left in place which caused erosion along the west property line. I informed him that all the work for the development package permit for this site needs to be inspected prior to building final. |
05/30/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - The entrance to the building is still under construction. There is no pavement to the building on any side. ML King Junior Way is still being graded and has not been paved |