Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0104

Parcel: 132130680

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0104

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
11/05/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/05/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/27/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing landscaping and riprap along the west and north perimeter’s of the site.
11/05/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/27/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing landscaping and riprap along the west and north perimeter’s of the site.
06/24/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Borderland is installing routed riprap at Island curb openings
06/20/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has installed paving up to the building and is currently working on accessible sidewalks and construction to the building entrance. Martin Luther King Way is closed.
05/30/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is performing final grade around building and in south parking lot and on Martin Luther King Junior way
05/16/2019 ENGR Grading Final BBENEDON Denied Entered by CBELL1 - Trash enclosure walls require rebar 32 inches on center. Footing was installed with verticals, number five at 48 inches on center for their building plans. Brian Walters with Renaissance companiesI’ll contact Dave Roberts, or install the additional rebar required for CO T standard detail 6.01.
05/14/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has installed asphalt in the west parking area only. There is no asphalt leading up into the building at this time. Borderland is completing final grading and has installed curbs. The main entrance to the building is still under construction. The GC is looking for a TCO for installing computers only, in about two weeks. Martin Luther King Junior Way is currently closed.
05/08/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractor is performing final grading on site and is doing work in the right of way and has Martin Luther King Jr. Way closed.
04/10/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractors installing solar canopies in west parking lot
04/02/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - I met with Boyd with Borderland, progress inspection. Borderland is paving the north and west sides of the property. All perimeter fencing has been removed. The job trailer has been relocated in the job entrance has moved.
03/14/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractors grading the site and has removed all perimeter fencing
03/08/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Grading parking lot
02/28/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Borderland is preparing grade and curbs for the west parking lot. I spoke with the Boarderland foreman about the requirements for depressed areas to be below the curb openings in these locations.
02/22/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - There is no activity on the site today due to inclement weather.
01/31/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Last run of 12 inch HDPE is OK, however a revision required for changes made. Connection to the manhole is OK. Plug at existing catch basin is OK
01/30/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Borderland is installing curbs.
01/23/2019 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - continuation of 12 to the north
01/24/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - 12 inch HDPE two N. upper terminal OK to cover. Manhole has been poured at 36 inch connection to existing
01/22/2019 ENGR Grading Final BBENEDON Correction Required Entered by VFLORES1 - Continuation of 12 in HDPE from manhole 32 upper terminal is okay to cover. Installation of 12 inch HDPE from manhole number for Upstream to First Catch Basin. Note manhole number four is undecided and will require revisions.
01/18/2019 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - 36" to new MH 12" upstrm
01/17/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - 12 in HDPE 2 first Upstream manhole okay. 36 inch HDPE installed from headwall to within 40 feet of existing tie in.
01/11/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREW CONTINUED WITH THE INSTALLATION OF THE 36 INCH HDPE DRAINAGE LINE AND POURED THE SOUTHERN MOST MANHOLE AS NOTED ON THE APPROVED SITE PLANS.
01/10/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREW INSTALLED 36 INCH HDPEFROM THE EXISTING DRAINAGEWAY SOUTH SIDE OF SITE AS NOTED AND SIGNED FOR ON THE APPROVED PLANS ON SITE. APPROXIMATELY 70 FEET
01/16/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Borderland has installed 12 inch HDPE from the First Southern catch basin into the manhole, and from the First Northern catch basin into manhole, and has backfield a 36-inch headwall.
01/15/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - I met with Mark and Jim with Renaissance companies and Allen with Borderland. Borderlands starting to install the 12 inch HDPE at the southwest side and we'll revise a plan to show a new manhole as opposed to the catch drain.
01/08/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR IS CURRENTLY WORKING ON THE CONSTRUCTION OF THE BUILDING MAINLY AT THIS TIME AND IS NOT DOING ANY TYPE OF REGULAR SITE WORK. THEY WILL BE WORKING ON GRADING FOR THE PARKING LOTS STARTING THIS NEXT WEEK AND WILL BE CALLING IN ADDITIONAL INSPECTIONS AT THAT TIME. I HAVE REMINDED THE PRIME CONTRACTOR AND BORDERLAND THAT WHEN THEY START INSTALLING THE DRAINAGE STRUCTURES THAT WE WILL NEED TO SEE THEM BEFORE ANYTHING IS COVERED BY BACKFILL.
11/05/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/27/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - We are waiting for a letter from the engineer of record certifying that the trash enclosure was correctly installed.