Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2019 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/02/2019 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by CBELL1 - Check out protection has been installed at the new job site entrance. |
| 07/31/2018 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Approved |
Entered by DROBERT5 - THE CONTRACTOR HAS STARTED PLACING THEIR STORMWATER CONTROLS BUT STILL NEED TO PLACE THE TRACKOUT MATERIAL AS NEEDED THROUGHOUT THE SITE. |