Permit: DP17-0182
Permit Details
Status:
Issued
Type:
Development Package
Address:
2121 N CRAYCROFT RD
Address NEW:
2121 N CRAYCROFT RD
Apply Date:
07/28/2017
Applicant:
Description:
Revision 12 started 4/16/25 *Revision 11 started 10/2/24 *Revision #10 started 3/12/24 (landscape island, bicycle parking, grading elevations)* Tentative Plat - Pima Medical Campus, Lots 1 thru 14, and Common Areas A, B, and C.
Permit Reviews
Permit Number - DP17-0182
Permit Status: Issued
Permit Description: Revision 12 started 4/16/25 *Revision 11 started 10/2/24 *Revision #10 started 3/12/24 (landscape island, bicycle parking, grading elevations)* Tentative Plat - Pima Medical Campus, Lots 1 thru 14, and Common Areas A, B, and C.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2022 | DEV PKG - OK TO SUBMIT | 03/10/2022 | COMPLETED |
| 03/07/2018 | DEV PKG - REVISION | 03/15/2018 | COMPLETED |
| 03/10/2022 | DEV PKG - REVISION | 04/08/2022 | COMPLETED |
| 03/15/2018 | DEV PKG - REVISION | 06/06/2018 | COMPLETED |
| 04/03/2019 | REVISION - - 3RD | 04/09/2019 | COMPLETED |
| 06/15/2018 | DEV PKG - REVISION | 06/26/2018 | COMPLETED |
| 07/28/2017 | DEV PKG - OK TO SUBMIT | 08/01/2017 | COMPLETED |
| 08/01/2017 | TENTATIVE PLAT REVIEW | 08/29/2017 | COMPLETED |
| 09/27/2019 | DEV PKG - OK TO SUBMIT | 10/28/2019 | COMPLETED |
| 10/04/2019 | REVISION - - 3RD | 10/09/2019 | COMPLETED |
| 10/25/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 11/08/2017 | COMPLETED |
| 10/28/2019 | DEV PKG - REVISION | 11/07/2019 | COMPLETED |
| 11/09/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 12/12/2017 | COMPLETED |
| 12/12/2017 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 02/01/2018 | COMPLETED |
| 11/04/2023 | DEVELOPMENT PACKAGE NEW v.2 | 11/20/2023 | APPROVED |
| 03/12/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/27/2024 | APPROVED |
| 11/21/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/10/2025 | REQUIRES RESUBMIT |
| 10/03/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/20/2024 | REQUIRES RESUBMIT |
| 08/28/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/12/2023 | REQUIRES RESUBMIT |
| 02/13/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/20/2025 | APPROVED |
| 04/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 05/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP17-0182
Permit Status: Issued
Permit Description: Revision 12 started 4/16/25 *Revision 11 started 10/2/24 *Revision #10 started 3/12/24 (landscape island, bicycle parking, grading elevations)* Tentative Plat - Pima Medical Campus, Lots 1 thru 14, and Common Areas A, B, and C.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP17-0182
Permite Description: Revision 12 started 4/16/25 *Revision 11 started 10/2/24 *Revision #10 started 3/12/24 (landscape island, bicycle parking, grading elevations)* Tentative Plat - Pima Medical Campus, Lots 1 thru 14, and Common Areas A, B, and C.
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 07/08/2025 | SITE - Stormwater Setup and Controls | N/A | Not Ready | Contractor hadn’t start on stored water, water harvesting, or the basins |
| 03/07/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | In addition to general comments, Trackout is performing as designed. It is raining lightly on site and but no not hard enough for any puddling. Waddle is being placed in areas where I informed them it is needed. |
| 07/28/2025 | N/A | Partial Pass | Bldg. 2, hotel, ADA parking space (South side, most western space) is 90" wide, needs to be 96". It is acceptable to reduce standard spaces to the East to 102" to gain extra width needed, would require restriping. | |
| 07/28/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Bldg. 2, hotel, underground tanks are installed and functioning, all rainwater harvesting areas are accurate to plans, sidewalk scuppers are good. Passes inspection. |
| 02/11/2025 | For trash and recycling enclosures | N/A | Partial Pass | Contractors OK to pour the footer for the trash closers two of them |
| 10/30/2024 | N/A | Not Ready | Contractors going to reschedule they’re not ready | |
| 08/13/2025 | COT - ENGR - Stormwater | N/A | Partial Pass | contractor needs to finish all the basins |
| 08/21/2025 | ENGR Grading Final | N/A | Partial Pass | bldg. 4, Starbucks: parking and drive ways, AB is graded in accordance with plans and compaction testing is over 100% throughout. Grading for this building is complete. Okay to pave. |
| 08/28/2025 | COT - ENGR - Signage Final | N/A | Partial Pass | Bldg. 4, Starbucks shell: All signage for this building is complete. |
| 03/04/2024 | SITE - Stormwater Final Inspection | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP17-0182
Permit Description: Revision 12 started 4/16/25 *Revision 11 started 10/2/24 *Revision #10 started 3/12/24 (landscape island, bicycle parking, grading elevations)* Tentative Plat - Pima Medical Campus, Lots 1 thru 14, and Common Areas A, B, and C.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/03/2020; Status: Approved; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Approved.} ; {Activity date: 07/25/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - For building five only} ; {Activity date: 07/23/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - For building five only. Fence needs to be installed around undeveloped lots Per Dave Roberts} ; {Activity date: 03/26/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } | |
| 09/06/2023 | ENGR Engineering Final | Passed | ||
| 03/06/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | discussed several project details: HDPE backfill/trench width/depth, ADA parking, solid waste enclosure, etc. |
|
| 12/19/2024 | Consultation SITE | Passed | Inform the contractor he needed to have all the testing from the third-party results on site starting January 1 | |
| 08/05/2025 | Passed | contractor, good to pour the drive-through driveway |