Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP17-0182
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 11/03/2020 | ENGR Engineering Final | RDELONNE | Partial Approval | Entered by PAHUMAD1 - Partial approval. OK for TCO For building eight only. Overall development package has not been completed. |
| 07/25/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - For building five only |
| 11/03/2020 | ENGR Engineering Final | RDELONNE | Approved | Entered by PAHUMAD1 - Approved. |
| 07/25/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - for building five only provide long-term bicycle parking per approved plans. Open DP for whole site. |
| 07/23/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - Walked in building five with GC needs to move ADA signs out of sidewalk. |
| 04/03/2019 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by CBELL1 - Install long term bicycle parking per approved plan. Install covered parking on south side of site per approved plan. Completion install of bollards per approved plan. Provide certification letter for all drainage and grading from engineer of record. Install all riprap Per approved plan. Install temporary fencing around all vacant dirt lots to separate public. Per Dave Roberts. All for phase 1 only. OK TCO per engineering only. |
| 03/26/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Walk site with general contractor went over work to complete |
| 03/21/2023 | ENGR Engineering Final | Not Ready | I met with Brad hug from Rio West end discussed roof drainage, outlets, sidewalks, and the handicap parking spaces. The handicap parking spaces are noncompliant for the last 1.5 feet and will be need to be made compliant prior to the finalization of this permit. | |
| 09/06/2023 | ENGR Engineering Final | Passed |