Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 02/23/2024 |
ENGR - Drainage Structures |
|
Not Ready |
rough grading in progress. Schedule inspections for stormwater, catch basins and remaining trash, enclosures to be installed. |
| 03/19/2024 |
ENGR - Drainage Structures |
|
Not Ready |
|
| 07/28/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Bldg. 2, hotel, underground tanks are installed and functioning, all rainwater harvesting areas are accurate to plans, sidewalk scuppers are good. Passes inspection. |