Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 02/11/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractors OK to pour the footer for the trash closers two of them |
| 02/18/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractors good to pour the floors for the both trash closers |
| 02/23/2024 |
For trash and recycling enclosures |
|
Not Ready |
|
| 02/23/2024 |
For trash and recycling enclosures |
|
Not Ready |
|
| 03/04/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractors good to pour the second trash enclosure apron |
| 03/19/2024 |
For trash and recycling enclosures |
|
Not Ready |
|
| 06/23/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractor is missing one number for vertical bar in front of the trash enclosure on the right hand side. Also, the contractor ordered the wrong bollards should’ve ordered 7 foot bollards not 6 foot bollards need to replace the bollards. |
| 06/24/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Contractor, good to pour the footers with the bollards |
| 07/03/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Vertical and horizontal reinforcement is in place. Plan to grout walls in a single lift, weep holes have been provided to verify flow. Okay to grout to full height. |
| 07/07/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Rebar placement is good. Compaction is good. Form slope is good. Okay to pour slab for side-by-side refuse enclosure. |
| 07/28/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Bldg 2, hotel, East refuse enclosure is complete and accurate to plans, passes inspection. |
| 07/28/2025 |
For trash and recycling enclosures |
|
Partial Pass |
Bldg 2, hotel, west refuse enclosure is complete and accurate to plans, passes inspection. |