Permit: DP17-0182

Parcel: 121093720


Addresses:

2121 N CRAYCROFT RD


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP17-0182

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
07/14/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No new activity on site and no change from last inspection
12/08/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - Continued. There is no activity on site at this time. There are two large sections of undeveloped dirt with no stabilization.
12/08/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. There is no activity on site at this time. There are two large sections of undeveloped dirt with no stabilization.
11/03/2020 ENGR Grading Final RDELONNE Partial Approval Entered by PAHUMAD1 - Partial approval. Same notes from grading final.
08/06/2020 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RSALDAT1 - Not ready. Appears that grading work is beginning.
07/16/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on building on southside of site doesn’t appear to be any grading activity at this time.
08/30/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET ON SITE .
08/29/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET GC ON SITE ABOUT INSTALLING CONTROL PER AP PLANS AND ADDING TRACK OUT ROCK AND CLEANING STREET.
08/17/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT CALLING IN FOR PRE-CON MEETING.
11/03/2020 ENGR Grading Final RDELONNE Partial Approval Entered by PAHUMAD1 - Partial approval. Same notes from grading final.
11/03/2020 ENGR Grading Final RDELONNE Partial Approval Entered by PAHUMAD1 - Partial approval. Same notes from grading final.
10/05/2020 ENGR Grading Final DROBERTS Partial Approval Entered by PAHUMAD1 - PARTIAL AT THIS TIME PENDING PHOTOGRAPHS FROM THE CONTRACTOR FOR THE REBAR AND GROUT FINAL LIFT ONCE THEY HAVE COMPLETED THE REBAR PLACEMENT IN THE 2 TRASH ENCLOSURES AND MINOR RETAINING WALL.
09/14/2020 ENGR Grading Final DROBERTS Not ready for Inspection Entered by RSALDAT1 - IS NOT READ AT THIS TIME, REPLACE THE WELDED WIRE FABRIC WITH #4 REBAR 12 INCHES ON CENTER IN BOTH DORECTIONS. NEED ALSO ADDITIONAL REBAR IN THE CORNERS, FIRST AND SECOND CELL NEEDS REBAR IN BOTH DIRECTIONS. RECALL INSPECTION TOMORROW WHEN COMPLETED.
07/25/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - For building five only
06/10/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by CBELL1 - Trash enclosure rebar mat per approved plans.
06/07/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete work before calling in for inspection.
11/24/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity on site at this time.
11/03/2020 ENGR Grading Final RDELONNE Approved Entered by PAHUMAD1 - Partial approval. Same notes from grading final.
10/26/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Building #8 check sidewalks from future building six and seven to building #8 ADA Parking only. Other sidewalks had dirt and debris. Provide physical separation at front door drop off for building #8 Not indicated on plans.
09/30/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Laying down AB In parking area.
09/21/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Started grading in parking area.
11/04/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time.
10/29/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time.
07/25/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - For building five only
06/25/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Vertical rebar for trashing closure OK.
05/13/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Met with general contractor on site. Told him that fencing was needed in south east section of site per Dave Roberts.
02/25/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
01/30/2019 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Walk site with GC went over most sidewalks cross slopes good ramps good on slopes still have to look at sidewalk that hasn’t been installed on south east corner of building and west side of building where bike parking is 288 parking. Have not checked any of the ADA parking yet.
12/20/2018 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - TRASH ENCLOSURE ON WEST AND SOUTHWEST OF BUILDING HAVE BEEN BUILT WITH OUT INSPECTIONS. ROOF DRAINS GOING OVER SIDE WALKS AND ADA RAMPS. PIPING FROM BUILDING TO BUBBLERS INSTALLED WITH OUT INSPECTION.
02/23/2024 ENGR Grading Final Partial Pass Rough grading in progress for revised, undeveloped area
02/26/2024 ENGR Grading Final Partial Pass stormwater collection system installed and being backfilled.
02/27/2024 ENGR Grading Final Partial Pass Backfilling stormwater structure. Burrito wrap plus a second layer of fabric on top.
03/19/2024 ENGR Grading Final Not Ready contractor working on underground detention
03/19/2024 ENGR Grading Final Not Ready contractor working on underground detention
03/21/2023 ENGR Grading Final Not Ready I met with Brad hug from Rio West end discussed roof drainage, outlets, sidewalks, and the handicap parking spaces. The handicap parking spaces are noncompliant for the last 1.5 feet and will be need to be made compliant prior to the finalization of this permit.
07/03/2023 ENGR Grading Final Passed
07/28/2025 ENGR Grading Final Partial Pass Building 4, Starbucks, sub-grade in drive through lane from Southeast corner of building to asphalt transition is good.
07/28/2025 ENGR Grading Final Re-inspection required Concerns only on the north side of building. Observed that Grade is lower at building then at drainage to parking lot, suggested to shoot the grade and make necessary corrections prior to recalling.
08/01/2025 ENGR Grading Final Partial Pass bldg. 4, Starbucks, parking lot grading is good, 'bluetop' in place for AB. Compaction of soil needs to be tested to 95%. Once compaction is met, okay to lay AB.
08/13/2025 ENGR Grading Final Partial Pass Contractor needs to get densities on the subgrade but looks good right now. Contractor will also call me when he places the AB and gets density for the AB.
08/14/2025 ENGR Grading Final Partial Pass bldg. 4, Starbucks: Sub-grade is correct, remaining density measurements will be completed today prior to laying AB. Pending compaction of 95% on sub-grade, okay to lay AB throughout parking, drive-thru, and entry lanes.
08/15/2025 ENGR Grading Final Partial Pass Building 4, Starbucks, sidewalk on West side of building is good to pour.
08/18/2025 ENGR Grading Final Partial Pass Bldg. 4, Starbucks: drive through lane's AB is proper depth and 100%+ compaction, welded wire is in place. Okay to pour concrete for remainder of drive through lane.
08/21/2025 ENGR Grading Final Partial Pass bldg. 4, Starbucks: parking and drive ways, AB is graded in accordance with plans and compaction testing is over 100% throughout. Grading for this building is complete. Okay to pave.
09/06/2023 ENGR Grading Final Passed