Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP17-0182
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 07/14/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No new activity on site and no change from last inspection |
| 12/08/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by PAHUMAD1 - Continued. There is no activity on site at this time. There are two large sections of undeveloped dirt with no stabilization. |
| 12/08/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. There is no activity on site at this time. There are two large sections of undeveloped dirt with no stabilization. |
| 11/03/2020 | ENGR Grading Final | RDELONNE | Partial Approval | Entered by PAHUMAD1 - Partial approval. Same notes from grading final. |
| 08/06/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Appears that grading work is beginning. |
| 07/16/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Working on building on southside of site doesn’t appear to be any grading activity at this time. |
| 08/30/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET ON SITE . |
| 08/29/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET GC ON SITE ABOUT INSTALLING CONTROL PER AP PLANS AND ADDING TRACK OUT ROCK AND CLEANING STREET. |
| 08/17/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT CALLING IN FOR PRE-CON MEETING. |
| 11/03/2020 | ENGR Grading Final | RDELONNE | Partial Approval | Entered by PAHUMAD1 - Partial approval. Same notes from grading final. |
| 11/03/2020 | ENGR Grading Final | RDELONNE | Partial Approval | Entered by PAHUMAD1 - Partial approval. Same notes from grading final. |
| 10/05/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by PAHUMAD1 - PARTIAL AT THIS TIME PENDING PHOTOGRAPHS FROM THE CONTRACTOR FOR THE REBAR AND GROUT FINAL LIFT ONCE THEY HAVE COMPLETED THE REBAR PLACEMENT IN THE 2 TRASH ENCLOSURES AND MINOR RETAINING WALL. |
| 09/14/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - IS NOT READ AT THIS TIME, REPLACE THE WELDED WIRE FABRIC WITH #4 REBAR 12 INCHES ON CENTER IN BOTH DORECTIONS. NEED ALSO ADDITIONAL REBAR IN THE CORNERS, FIRST AND SECOND CELL NEEDS REBAR IN BOTH DIRECTIONS. RECALL INSPECTION TOMORROW WHEN COMPLETED. |
| 07/25/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - For building five only |
| 06/10/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by CBELL1 - Trash enclosure rebar mat per approved plans. |
| 06/07/2019 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete work before calling in for inspection. |
| 11/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. No grading activity on site at this time. |
| 11/03/2020 | ENGR Grading Final | RDELONNE | Approved | Entered by PAHUMAD1 - Partial approval. Same notes from grading final. |
| 10/26/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Building #8 check sidewalks from future building six and seven to building #8 ADA Parking only. Other sidewalks had dirt and debris. Provide physical separation at front door drop off for building #8 Not indicated on plans. |
| 09/30/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Laying down AB In parking area. |
| 09/21/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by JSCHNEI2 - Continue. Started grading in parking area. |
| 11/04/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No grading activity at this time. |
| 10/29/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - No grading activity at this time. |
| 07/25/2019 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by DMERANZ1 - For building five only |
| 06/25/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Vertical rebar for trashing closure OK. |
| 05/13/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Met with general contractor on site. Told him that fencing was needed in south east section of site per Dave Roberts. |
| 02/25/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 01/30/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by CBELL1 - Walk site with GC went over most sidewalks cross slopes good ramps good on slopes still have to look at sidewalk that hasn’t been installed on south east corner of building and west side of building where bike parking is 288 parking. Have not checked any of the ADA parking yet. |
| 12/20/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - TRASH ENCLOSURE ON WEST AND SOUTHWEST OF BUILDING HAVE BEEN BUILT WITH OUT INSPECTIONS. ROOF DRAINS GOING OVER SIDE WALKS AND ADA RAMPS. PIPING FROM BUILDING TO BUBBLERS INSTALLED WITH OUT INSPECTION. |
| 02/23/2024 | ENGR Grading Final | Partial Pass | Rough grading in progress for revised, undeveloped area | |
| 02/26/2024 | ENGR Grading Final | Partial Pass | stormwater collection system installed and being backfilled. | |
| 02/27/2024 | ENGR Grading Final | Partial Pass | Backfilling stormwater structure. Burrito wrap plus a second layer of fabric on top. | |
| 03/19/2024 | ENGR Grading Final | Not Ready | contractor working on underground detention | |
| 03/19/2024 | ENGR Grading Final | Not Ready | contractor working on underground detention | |
| 03/21/2023 | ENGR Grading Final | Not Ready | I met with Brad hug from Rio West end discussed roof drainage, outlets, sidewalks, and the handicap parking spaces. The handicap parking spaces are noncompliant for the last 1.5 feet and will be need to be made compliant prior to the finalization of this permit. | |
| 07/03/2023 | ENGR Grading Final | Passed | ||
| 07/28/2025 | ENGR Grading Final | Partial Pass | Building 4, Starbucks, sub-grade in drive through lane from Southeast corner of building to asphalt transition is good. | |
| 07/28/2025 | ENGR Grading Final | Re-inspection required | Concerns only on the north side of building. Observed that Grade is lower at building then at drainage to parking lot, suggested to shoot the grade and make necessary corrections prior to recalling. | |
| 08/01/2025 | ENGR Grading Final | Partial Pass | bldg. 4, Starbucks, parking lot grading is good, 'bluetop' in place for AB. Compaction of soil needs to be tested to 95%. Once compaction is met, okay to lay AB. | |
| 08/13/2025 | ENGR Grading Final | Partial Pass | Contractor needs to get densities on the subgrade but looks good right now. Contractor will also call me when he places the AB and gets density for the AB. | |
| 08/14/2025 | ENGR Grading Final | Partial Pass | bldg. 4, Starbucks: Sub-grade is correct, remaining density measurements will be completed today prior to laying AB. Pending compaction of 95% on sub-grade, okay to lay AB throughout parking, drive-thru, and entry lanes. | |
| 08/15/2025 | ENGR Grading Final | Partial Pass | Building 4, Starbucks, sidewalk on West side of building is good to pour. | |
| 08/18/2025 | ENGR Grading Final | Partial Pass | Bldg. 4, Starbucks: drive through lane's AB is proper depth and 100%+ compaction, welded wire is in place. Okay to pour concrete for remainder of drive through lane. | |
| 08/21/2025 | ENGR Grading Final | Partial Pass | bldg. 4, Starbucks: parking and drive ways, AB is graded in accordance with plans and compaction testing is over 100% throughout. Grading for this building is complete. Okay to pave. | |
| 09/06/2023 | ENGR Grading Final | Passed |