Permit: DP17-0182

Parcel: 121093720


Addresses:

2121 N CRAYCROFT RD


Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP17-0182

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
11/30/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. No concerns at this time.
11/18/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. No concerns at this time.
11/09/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. No track out at this time
11/03/2020 SITE - Stormwater Follow-up RDELONNE Not ready for Inspection Entered by PAHUMAD1 - Not ready.
07/25/2019 SITE - Stormwater Follow-up RLEDONNE Partial Approval Entered by DMERANZ1 - For building five only
03/26/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - went over repairs that need to be made on other Phases
02/21/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
02/11/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
02/07/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
01/30/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Provide controls around stockpile.
01/04/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by CBELL1 - Provide swppp controls around stock piles on East End of site
12/20/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - REPAIR CONTROLS ON NORTH SIDE OF SITE.
12/14/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER REPAIRS TO SWPPP CONTROLS.
11/28/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT CALLING FOR INSPECTION. REPAIRS NEED TO BE MADE ON NORTH SIDE OF SITE.
11/02/2018 SITE - Stormwater Follow-up RLEDONNE Not ready for Inspection Entered by RLEDONN1 - TALKED WITH GC CHIS ABOUT COPY OF NOI AND TO POST SWPPP INFO AT GATE.
10/19/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS. MET WITH GC ABOUT CALLING IN SWPPP INSPECTIONS.
09/25/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
09/19/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - CONTROLS HAVE BEEN INSTALLED ON NORTH AND WEST SIDE OF SITE.
08/31/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - TALKED WITH JAY KNOLL ABOUT NOI FOR THIS SITE.
01/27/2025 SITE - Stormwater Follow-up Complete (Recurring) No charge at this time everything looks good
02/03/2025 SITE - Stormwater Follow-up Complete (Recurring) Everything looks good at this time
02/18/2025 SITE - Stormwater Follow-up Partial Pass Contractor called in the wrong inspection. He needs the inspection for the floor for the trash enclosure. They’re good to pour both floors for trash enclosure.
02/23/2024 SITE - Stormwater Follow-up Partial Pass Correct, damaged or missing Stormwater controls as needed.
02/28/2024 SITE - Stormwater Follow-up Complete (Recurring) installing north south trench for HDPE pipe to stormwater structure.
02/29/2024 SITE - Stormwater Follow-up Complete (Recurring) no major changes from yesterday due to heavy rains.
03/03/2025 SITE - Stormwater Follow-up Partial Pass Contractors good to pour the floor for the trash enclosure on the north west side and to grout both trash enclosures
03/05/2024 SITE - Stormwater Follow-up Complete (Recurring) installing 48 inch pipe.
03/07/2025 SITE - Stormwater Follow-up Complete (Recurring) In addition to general comments, Trackout is performing as designed.
It is raining lightly on site and but no not hard enough for any puddling. Waddle is being placed in areas where I informed them it is needed.
03/12/2024 SITE - Stormwater Follow-up Complete (Recurring) finishing tops of manholes 1&2 on north side of project. Basins will be started next week.
03/13/2024 SITE - Stormwater Follow-up Complete (Recurring) still working on manholes 1 & 2 north side. no changes from yesterday.
03/14/2024 SITE - Stormwater Follow-up Complete (Recurring) discussed protecting north property boundary,

replace wattles at northwest corner of property,

protect with nerving or wattles etc. the two southern entrances to property.
03/18/2024 SITE - Stormwater Follow-up Complete (Recurring)
03/19/2024 SITE - Stormwater Follow-up Partial Pass
03/20/2025 SITE - Stormwater Follow-up Complete (Recurring) i’m having the contractor put some wattlesaround the spoils
03/21/2024 SITE - Stormwater Follow-up Complete (Recurring) replace damaged wattles at northwest corner of property
03/22/2024 SITE - Stormwater Follow-up Partial Pass
03/25/2024 SITE - Stormwater Follow-up Complete (Recurring) replace wattles NWC property
03/26/2024 SITE - Stormwater Follow-up Complete (Recurring) discussed on-going sub-grade stormwater basin construction. advised track out on Craycroft needed sweeping.
03/27/2024 SITE - Stormwater Follow-up Complete (Recurring) track out onto Craycroft needs cleaning
04/01/2024 SITE - Stormwater Follow-up Complete (Recurring) project not open today. wattles still need replacing northwest corner project.
04/01/2025 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
04/02/2024 SITE - Stormwater Follow-up Complete (Recurring) no activity due to rain
04/03/2025 SITE - Stormwater Follow-up Partial Pass Contractors installing stormwater chambers on the north east side of the building by 200 lineal feet long live installed about 80 feet plus or minus everything’s good they’ve installed per plan
04/08/2024 SITE - Stormwater Follow-up Not Ready Track pad does not go to curb line and no indication of any other storm water controls put in place. Need Plans as construction trailer locked up.
04/08/2025 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
04/10/2024 SITE - Stormwater Follow-up Not Ready no wattles on north and west sides of project. stabilized construction entrance needs improvement now that rains have abated. have requested erosion controls be put in place multiple times.
04/11/2024 SITE - Stormwater Follow-up Not Ready same comments as yesterday.
04/15/2024 SITE - Stormwater Follow-up Not Ready same comments as before.
04/16/2024 SITE - Stormwater Follow-up Not Ready same notes, other than the northwest corner were wattle has been installed.
04/18/2024 SITE - Stormwater Follow-up Not Ready filter fabric below metal grates at drainage structure, butt plug opening south side of structure.

stake wattle NWC SITE,

install staked wattles, with 18 to 24 inch overlap, on north property line.
04/24/2024 SITE - Stormwater Follow-up Not Ready no protection in place. David Robert’s requested specific controls on north side of project. not present. verballycommunicated 4/18.
04/24/2025 SITE - Stormwater Follow-up Complete (Recurring) No church at this time
04/26/2024 SITE - Stormwater Follow-up Partial Pass
04/29/2024 SITE - Stormwater Follow-up Not Ready all outstanding items from last inspection have not been addressed.
05/02/2024 SITE - Stormwater Follow-up Not Ready no SWPPP controls in-place as requested, no SWPPP plan other than what is detailed in plans, no SWPPP inspection reports, informed third party was managing SWPPP inspections and I could contact them directly. Informed PM this was not acceptable, SWPPP sign is blank, no documents posted, see pictures.
05/15/2025 SITE - Stormwater Follow-up Complete (Recurring) No changes at this time and no concerns. Everything still looks good.
06/07/2024 SITE - Stormwater Follow-up Not Ready per contractor text.
06/10/2025 SITE - Stormwater Follow-up Complete (Recurring) every thing is good at is time
06/24/2024 SITE - Stormwater Follow-up Complete (Recurring) This project looks like it has been completed for sometime. Why is it closed out?
06/24/2025 SITE - Stormwater Follow-up Complete (Recurring) Everything looks good at this time no concerns
07/08/2025 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
07/22/2025 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time everything looks good
10/11/2024 SITE - Stormwater Follow-up Complete (Recurring) No Concerns at this time
10/18/2024 SITE - Stormwater Follow-up Complete (Recurring) Not too bad, a few items to fix.
Redo the track pad, 20' wide and 50' in depth.
Repair or install missing wattle
Stock pile needs to be no more in hgt. than 8' and south, east and west sides should have wattle.
10/23/2024 SITE - Stormwater Follow-up Complete (Recurring) Everything looks good there’s no concerns at this time
11/06/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time everything looks good
11/12/2024 SITE - Stormwater Follow-up Complete (Recurring) Everything’s still in place no concerns at this time
11/18/2024 SITE - Stormwater Follow-up Complete (Recurring) Informed the contractor they needed more track out rock in the front area
12/05/2024 SITE - Stormwater Follow-up Complete (Recurring) I asked the contractor to install more. Trout rock on the Craycroft entrance.
12/16/2024 SITE - Stormwater Follow-up Complete (Recurring) No changes at this time everything looks good
12/30/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time everything looks good