Permit: DP16-0182
Permit Details
Status:
Complete
Type:
Development Package
Address:
710 S GREASEWOOD RD
Address NEW:
710 S GREASEWOOD RD
Apply Date:
10/20/2016
Applicant:
Description:
GRADING ONLY - STARR PASS VISTAS
Permit Reviews
Permit Number - DP16-0182
Permit Status: Complete
Permit Description: GRADING ONLY - STARR PASS VISTAS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2016 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 10/20/2016 | COMPLETED |
| 10/20/2016 | GRADING | 11/07/2016 | COMPLETED |
| 11/21/2016 | RESUB - SITE and/or GRADING | 11/28/2016 | COMPLETED |
| 12/18/2017 | REVISION - GRADING | 12/18/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0182
Permit Description: GRADING ONLY - STARR PASS VISTAS
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/11/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/11/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 01/11/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/11/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/11/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.} | |
| 06/11/2019 | ENGR Grading Final | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.} | |
| 06/11/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.} | |
| 06/18/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND.} ; {Activity date: 10/03/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Project appears to be 75% complete. There is construction in progress. Stormwater controls are still in place. Minor erosion issues need to be corrected. There are material stock piles blocking sidewalks and on Street. There is sediment within concrete drainage structures.} | |
| 06/18/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND.} ; {Activity date: 10/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is track out on the streets within the community} ; {Activity date: 09/17/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.} ; {Activity date: 05/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS WORKING ON SITE AND PAD WALLS.} ; {Activity date: 04/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 03/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 02/28/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/02/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH VICTOR ON SITE KEEPING UP ON SWPPP CONTROLS AND WORKING ON RIP-RAP.} ; {Activity date: 07/27/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REPAIR TO SWPPP CONTROLS.} ; {Activity date: 07/13/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/24/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME SINCE WE HAVE HAD NO RAINS. I HAVE REMINDED THE CONTRACTOR THAT THEY NEED TO CHECK THE AREAS WHERE THEY HAVE BEEN INSTALLING PIPE CROSSINGS TO MAKE SURE THAT THE SURROUNDING AREAS ARE STILL PROTECT FROM WATER RUN OFF. I WILL ASK RON TO CHECK THIS AREA ONCE HE RETURNS TO ENSURE THAT NOTHING ELSE IS REQUIRED.} ; {Activity date: 04/18/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 1) LOOKED AT MULTIPLE CMP AND SRP ROAD CROSSINGS AT THE SITE. VERIFIED THE SIZE OF PIPE, MATERIAL, PROPER GRADE, AND INSTALLATION FOR THE PIPE. ALL CONSTRUCTED PER APPROVED PLAN. 2) CONTINUE TO ENSURE INSPECTIONS ARE COMPLETED PRIOR TO COVERING PIE OR CATCH BASINS. 3) OK TO COVER SECTIONS OF PIPE THAT WERE INSPECTED - PICTURES TAKEN} ; {Activity date: 03/20/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS .} ; {Activity date: 02/28/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/06/2017; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - WORKING ON HOME LOTS AND ROADS. NO SWPP CONCERNS AT THIS TIME.} ; {Activity date: 01/31/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STILL GRADING ON NORTH SIDE OF SITE.} ; {Activity date: 01/23/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/17/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} |
|
| 06/18/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/18/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND.} | |
| 07/23/2020 | ENGR Engineering Final | Passed | {Activity date: 07/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL WORK IS COMPLETED AT THIS TIME, MINOR MAINTENANCE WORK IS INSPECTED UNDER THE COMBO PERMIT FOR LOTS 1 AND 43} ; {Activity date: 06/18/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND.} ; {Activity date: 10/03/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Project appears to be 75% complete. There is construction in progress. Stormwater controls are still in place. Minor erosion issues need to be corrected. There are material stock piles blocking sidewalks and on Street. There is sediment within concrete drainage structures.} ; {Activity date: 01/08/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GRADING CONTRACTOR WALKED NORTH END OF SITE WENT OVER WORK TO COMPLET. WENT OVER AS-BUILTS CHANGE IN PIPING SIZE OF OUT LET PIPE FOR BASIN BY LOT #9 NOT ON AS-BUILTS. NEED TO COMPLET ALL LANDSCAPING SIDE WALKS ALL WORK ON AP PLANS AND CERT LETTER FROM ENGINEER OF RECORD. AND MONITORING REPORT FROM LANDSCAPE ARCHITECT FOR NPPO.} ; {Activity date: 12/20/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MEETING ON SITE NEXT WEEK .} ; {Activity date: 11/01/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SOUTH SIDE OF SITE UP TO LOT # 8 WITH MIKE FROM BORDERLAND CHECKING DRAINAGE AREAS AND PIPING/ RIP-RAP WENT OVER WORK TO COMPLET IN THAT AREA AND TO PROVIDE AS-BUILTS FOR ALL CHANGES TO AP PLANS AND CERT LETTER FROM ENGINEER OF RECORD.} ; {Activity date: 10/27/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON REPAIRS TO SIDE WALKS AND RAMPS. IWALKED SOUTH SIDE OF SITE TO CHECK REPAIRS.} ; {Activity date: 10/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TALKED TO GRADING SUPER ABOUT SIDEWALKS THAT ARE OVER 2% CROSS SLOPES.} |