Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 06/11/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 06/18/2020 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND. |
| 10/03/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Project appears to be 75% complete. There is construction in progress. Stormwater controls are still in place. Minor erosion issues need to be corrected. There are material stock piles blocking sidewalks and on Street. There is sediment within concrete drainage structures. |