| 06/11/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 06/11/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 06/11/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 05/24/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON SIDEWALKS. |
| 06/11/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 12/06/2018 |
ENGR Grading Final |
bbenedo1 |
Continued |
Entered by BBENEDO1 - Workimg on large Basin |
| 10/30/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - SITE SIDE WALKS SLOPES OK AND RAMPS SIDEWALKS AT HOMES NOT INSTALLED . |
| 10/20/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 10/19/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH CONTRATOR AND WENT OVER AREAS THAT ARE OVER 2%. |
| 09/14/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE CHECKED SLOPES ON SIDEWALKS ON NORTH SIDE OF SITE PER HIGH LIGHT ON 11X17 PLANS IN TRUCK. |
| 09/06/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH MIKE WITH BORDERLAND ON SITE . WORKING IN RIGHT OF WAY. STARTING TO CHECK SIDEWALK SLOPES. |
| 07/10/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - SIDEWALK SCUPPERS ON SOUTH SIDE OF SITE IN CUL-DE-SAC. REBAR OK. |
| 04/28/2017 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - COMPLETE ALL WORK PER THE APPROVED PLANS |
| 06/23/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON CURBING AND STREETS. |
| 06/20/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSTALLING REBAR IN WALLS FOR CATCHBASIN IN STREET NORTH EAST OF LOT #10 |
| 06/15/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - CATCH BASIN IN STREET NORTH EAST OF LOT #10 REBAR IN FLOOR OK. |
| 05/12/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - REBAR IN TOPS FOR CATCH BASINS BY LOTS #5 AND #9 OK. |
| 05/08/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - CATCH BASIN REBAR ON WEST SIDE OF COMMON AREA. |
| 05/05/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON CATCH BASIN FORMS. |
| 05/04/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - CATCH BASN ON EAST SIDE OF CASTAR DR BY LOT #9 REBAR IN WALL OK ONLY. |
| 05/03/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - REBAR IN SIDEWALK SCUPPER IN ROUAD A BOUT JUST OFF OF GREASEWOOD ROAD. |
| 05/02/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON SIDE WALK SCUPPERS ON NORTH SIDE OF SITE. |
| 04/28/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER CATCH BASIN #310. |
| 04/24/2017 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - DROVE THROUGH THE SITE THE CREWS CONTINUE TO WORK ON THE INSTALLATIONS OF THE DRAINAGE PIPE UNDERNEATH THE ROADWAYS AT VARIOUS LOCATIONS. THEY HAVE COMPLETED THE CSP INSTALLATION AT THE SOUTHWEST CORNER OF THE SITE OFF OF STARR PASS.
ALSO THE CURB CREW IS WORKING ON PREPARING THE GRADE FOR CURBS THROUGH OUT THE SITE. THEY SHOULD BE DONE USING THE CURB MACHINE BY THIS AFTERNOON FOR THIS AREA BUT WILL USE IT LATER ON IN OTHER AREAS. THEY WILL BE HAND POURING CURB AT VARIOUS LOCATIONS IN THE NORTH EAST QUADRANT THROUGH THE REST OF THE WEEK. BORDERLAND HAS ADVISED ME THAT THIS IS THE AREA WHERE THE MODEL HOMES WILL BE CONSTRUCTED STARTING IN A COUPLE OF WEEKS.
THE CONTRACTOR IS WORKING ON THE UTILITY INSTALLATIONS THROUGH OUT THIS SITE FOR WATER, SEWER, AND ELECTRICAL, THESE AREAS ARE BEING INSPECTED BY OUTHER INSPECTORS FOR THE UTILITIES. |
| 04/24/2017 |
ENGR Grading Final |
MRUSSO |
Cancelled |
Entered by DROBERT5 - COULD NOT CONTACT SITE FORMAN |
| 04/21/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT SRP CULVERT PIPING ALONG SW CORNER OF SITE- INSTALLED PER APPROVED PLANS - OK TO COVER, PICS TAKEN
2) LOOKED AT VERTICAL CURBING ALONG ENTRANCE TO SITE OFF OF GREASEWOOD - INSTALLED PER PLAN |
| 04/19/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSPECTED THE INSTALL OF TWO 42" SRP AT THE ROAD CROSSING ALONG THE SW SIDE OF SITE.
2) ENSURE THE TRENCH IS COMPACTED, PIPE IS BEDDED, AND GRADED PER APPROVED PLANS - PICS TAKEN
CALL FOR RE-INSPECTION PRIOR TO COVER |
| 04/18/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) LOOKED AT MULTIPLE CMP AND SRP ROAD CROSSINGS AT THE SITE. VERIFIED THE SIZE OF PIPE, MATERIAL, PROPER GRADE, AND INSTALLATION FOR THE PIPE. ALL CONSTRUCTED PER APPROVED PLAN.
2) CONTINUE TO ENSURE INSPECTIONS ARE COMPLETED PRIOR TO COVERING PIE OR CATCH BASINS.
3) OK TO COVER SECTIONS OF PIPE THAT WERE INSPECTED - PICTURES TAKEN |
| 03/20/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON SITE WATER. |
| 03/13/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. ENTRANCE OFF OF GREASEWOOD BACK OPEN. |
| 02/16/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH MIKE ON SITE . |
| 02/15/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON ROADS AND LOTS. |
| 01/27/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON ROAD AND PAD GRADING. |