Permit: DP16-0182

Parcel: 116293360


Addresses:

710 S GREASEWOOD RD

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
06/11/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
06/10/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.
06/11/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
06/10/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.
06/11/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
06/10/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.
05/24/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON SIDEWALKS.
06/11/2019 ENGR Grading Final BBENEDON Approved Entered by CBELL1 -
06/10/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.
12/06/2018 ENGR Grading Final bbenedo1 Continued Entered by BBENEDO1 - Workimg on large Basin
10/30/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - SITE SIDE WALKS SLOPES OK AND RAMPS SIDEWALKS AT HOMES NOT INSTALLED .
10/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/19/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH CONTRATOR AND WENT OVER AREAS THAT ARE OVER 2%.
09/14/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE CHECKED SLOPES ON SIDEWALKS ON NORTH SIDE OF SITE PER HIGH LIGHT ON 11X17 PLANS IN TRUCK.
09/06/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH MIKE WITH BORDERLAND ON SITE . WORKING IN RIGHT OF WAY. STARTING TO CHECK SIDEWALK SLOPES.
07/10/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - SIDEWALK SCUPPERS ON SOUTH SIDE OF SITE IN CUL-DE-SAC. REBAR OK.
04/28/2017 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - COMPLETE ALL WORK PER THE APPROVED PLANS
06/23/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CURBING AND STREETS.
06/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - INSTALLING REBAR IN WALLS FOR CATCHBASIN IN STREET NORTH EAST OF LOT #10
06/15/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - CATCH BASIN IN STREET NORTH EAST OF LOT #10 REBAR IN FLOOR OK.
05/12/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR IN TOPS FOR CATCH BASINS BY LOTS #5 AND #9 OK.
05/08/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - CATCH BASIN REBAR ON WEST SIDE OF COMMON AREA.
05/05/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON CATCH BASIN FORMS.
05/04/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - CATCH BASN ON EAST SIDE OF CASTAR DR BY LOT #9 REBAR IN WALL OK ONLY.
05/03/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR IN SIDEWALK SCUPPER IN ROUAD A BOUT JUST OFF OF GREASEWOOD ROAD.
05/02/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON SIDE WALK SCUPPERS ON NORTH SIDE OF SITE.
04/28/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER CATCH BASIN #310.
04/24/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - DROVE THROUGH THE SITE THE CREWS CONTINUE TO WORK ON THE INSTALLATIONS OF THE DRAINAGE PIPE UNDERNEATH THE ROADWAYS AT VARIOUS LOCATIONS. THEY HAVE COMPLETED THE CSP INSTALLATION AT THE SOUTHWEST CORNER OF THE SITE OFF OF STARR PASS. ALSO THE CURB CREW IS WORKING ON PREPARING THE GRADE FOR CURBS THROUGH OUT THE SITE. THEY SHOULD BE DONE USING THE CURB MACHINE BY THIS AFTERNOON FOR THIS AREA BUT WILL USE IT LATER ON IN OTHER AREAS. THEY WILL BE HAND POURING CURB AT VARIOUS LOCATIONS IN THE NORTH EAST QUADRANT THROUGH THE REST OF THE WEEK. BORDERLAND HAS ADVISED ME THAT THIS IS THE AREA WHERE THE MODEL HOMES WILL BE CONSTRUCTED STARTING IN A COUPLE OF WEEKS. THE CONTRACTOR IS WORKING ON THE UTILITY INSTALLATIONS THROUGH OUT THIS SITE FOR WATER, SEWER, AND ELECTRICAL, THESE AREAS ARE BEING INSPECTED BY OUTHER INSPECTORS FOR THE UTILITIES.
04/24/2017 ENGR Grading Final MRUSSO Cancelled Entered by DROBERT5 - COULD NOT CONTACT SITE FORMAN
04/21/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) LOOKED AT SRP CULVERT PIPING ALONG SW CORNER OF SITE- INSTALLED PER APPROVED PLANS - OK TO COVER, PICS TAKEN 2) LOOKED AT VERTICAL CURBING ALONG ENTRANCE TO SITE OFF OF GREASEWOOD - INSTALLED PER PLAN
04/19/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED THE INSTALL OF TWO 42" SRP AT THE ROAD CROSSING ALONG THE SW SIDE OF SITE. 2) ENSURE THE TRENCH IS COMPACTED, PIPE IS BEDDED, AND GRADED PER APPROVED PLANS - PICS TAKEN CALL FOR RE-INSPECTION PRIOR TO COVER
04/18/2017 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) LOOKED AT MULTIPLE CMP AND SRP ROAD CROSSINGS AT THE SITE. VERIFIED THE SIZE OF PIPE, MATERIAL, PROPER GRADE, AND INSTALLATION FOR THE PIPE. ALL CONSTRUCTED PER APPROVED PLAN. 2) CONTINUE TO ENSURE INSPECTIONS ARE COMPLETED PRIOR TO COVERING PIE OR CATCH BASINS. 3) OK TO COVER SECTIONS OF PIPE THAT WERE INSPECTED - PICTURES TAKEN
03/20/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON SITE WATER.
03/13/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. ENTRANCE OFF OF GREASEWOOD BACK OPEN.
02/16/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH MIKE ON SITE .
02/15/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON ROADS AND LOTS.
01/27/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON ROAD AND PAD GRADING.