Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
| Date |
Description |
Inspector |
Results |
Comments |
| 06/11/2019 |
PDSD Site/Engineering Division - NPPO |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 06/10/2019 |
PDSD Site/Engineering Division - NPPO |
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |