Permit Number: DP16-0182
Parcel: 116293360

Review Status: Completed

Review Details: GRADING

Permit Number - DP16-0182
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/26/2016 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: October 26, 2016
DUE DATE: November 18, 2016
SUBJECT: Grading Plan
TO: Rick Engineering Company
LOCATION: 710 S Greasewood Road
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: DP16-0182
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Per AM 2-06.4.3 please add the case number (DP16-0182).
2) The phrase "see general note 22" that has been included in keynote 4 does not seem to fit for this situation. Please review and update accordingly.
3) Sheet 3 shows a longitudinal slope of 3.23 % at the southwest end of Castar Drive instead of the 1.75 % as shown on figure 6 of the drainage report for this location. Sheet 15 also shows the 1.75 % cross slope. Please evaluate impacts and make appropriate updates between plan and drainage analysis.
4) Sheet 3 shows 2-30" SRPs instead of 2-24" SRPs as shown in Figure 6 of the drainage report. While it is acceptable to upsize in this location to decrease the headwater elevation, the invert elevation of 73.4 as shown on the plans may be a typo as compared to 2474.3 as shown in the culvert summary table of figure 6 in the drainage report. Detail SC on sheet 11 should also be evaluated and changes made if appropriate. Please review and update accordingly.
5) Sheet 5 shows a longitudinal street slope of 0.5% instead of 1% as shown in figure 6 of the drainage report. See sheet 14 where the 0.5% longitudinal slope is also shown. Please review and update as appropriate.
6) Paving note 12 on sheet 6 should be updated to reflect the need for PDSD Engineering to review revisions instead of Permits and Codes. Permits and Code is a part of TDOT and reviews public right of way improvements.
7) Paving note 13 shows a design speed of 2 miles per hour. Please update this typo to reflect the correct design speed for this project.
8) The 2% cross slope shown near the southeast corner of common Area C (between lots 41 and 42) does not match the watershed boundaries as shown on Figure 6 of the Drainage report. Please evaluation and make appropriate adjustments.
9) Sheet 14 shows a crown cross section near the northeast corner of lot 29. This does not match the flow arrow directions for this street as shown on Figure 6 of the drainage report. Please evaluate and make adjustments as appropriate.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
10/28/2016 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 710 S. Greasewood Road
Grading Plan (1st Review)
DP16-0182

TRANSMITTAL DATE: October 28, 2016

DUE DATE: November 18, 2016

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The grading plan has been reviewed by the Zoning Section but cannot approve the plan until all Engineering, comments, concerns, and appropriate revisions have been addressed.

Once approved by Engineering Zoning is willing to provide an over the counter review. Please call or email to schedule this review.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
11/04/2016 ANDREW CONNOR NPPO REVIEW Approv-Cond Ensure that all Engineering comments and concerns are addressed prior to Landscape / NPPO approval stamp.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/07/2016 ARUIZ1 OUT TO CUSTOMER Completed