Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP16-0182

Parcel: 116293360


Addresses:

710 S GREASEWOOD RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
06/18/2020 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND.
10/03/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There is track out on the streets within the community
09/17/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 -
06/10/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth.
05/10/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS WORKING ON SITE AND PAD WALLS.
04/20/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
03/09/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
02/28/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
02/20/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/29/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
01/23/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/05/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
08/02/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH VICTOR ON SITE KEEPING UP ON SWPPP CONTROLS AND WORKING ON RIP-RAP.
07/27/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REPAIR TO SWPPP CONTROLS.
07/13/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
04/24/2017 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME SINCE WE HAVE HAD NO RAINS. I HAVE REMINDED THE CONTRACTOR THAT THEY NEED TO CHECK THE AREAS WHERE THEY HAVE BEEN INSTALLING PIPE CROSSINGS TO MAKE SURE THAT THE SURROUNDING AREAS ARE STILL PROTECT FROM WATER RUN OFF. I WILL ASK RON TO CHECK THIS AREA ONCE HE RETURNS TO ENSURE THAT NOTHING ELSE IS REQUIRED.
04/18/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 1) LOOKED AT MULTIPLE CMP AND SRP ROAD CROSSINGS AT THE SITE. VERIFIED THE SIZE OF PIPE, MATERIAL, PROPER GRADE, AND INSTALLATION FOR THE PIPE. ALL CONSTRUCTED PER APPROVED PLAN. 2) CONTINUE TO ENSURE INSPECTIONS ARE COMPLETED PRIOR TO COVERING PIE OR CATCH BASINS. 3) OK TO COVER SECTIONS OF PIPE THAT WERE INSPECTED - PICTURES TAKEN
03/20/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS .
02/28/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
02/15/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
02/06/2017 SITE - Stormwater Follow-up RLEDONN1 Continued Entered by RLEDONN1 - WORKING ON HOME LOTS AND ROADS. NO SWPP CONCERNS AT THIS TIME.
01/31/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - STILL GRADING ON NORTH SIDE OF SITE.
01/23/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
01/17/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.