| 06/18/2020 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - THIS SITE IS COMPLETE EXCEPT FOR THE SIDEWALKS AT THE FOLLOWING LOTS 1 - 3, AND 43, THIS WORK IS BEING COMPLETED UNDER THE COMPLETION BOND. |
| 10/03/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - There is track out on the streets within the community |
| 09/17/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - |
| 06/10/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - The project is ongoing. Some construction materials, debris and landscaping stock piles present and located in the streets in some areas. Stormwater controls are still in place and there are no issues at this time. Basins appeared to be in fair condition with some overgrowth. |
| 05/10/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS WORKING ON SITE AND PAD WALLS. |
| 04/20/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 03/09/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 02/28/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/20/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/29/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 01/23/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/05/2018 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 08/02/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH VICTOR ON SITE KEEPING UP ON SWPPP CONTROLS AND WORKING ON RIP-RAP. |
| 07/27/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT REPAIR TO SWPPP CONTROLS. |
| 07/13/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 04/24/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME SINCE WE HAVE HAD NO RAINS. I HAVE REMINDED THE CONTRACTOR THAT THEY NEED TO CHECK THE AREAS WHERE THEY HAVE BEEN INSTALLING PIPE CROSSINGS TO MAKE SURE THAT THE SURROUNDING AREAS ARE STILL PROTECT FROM WATER RUN OFF. I WILL ASK RON TO CHECK THIS AREA ONCE HE RETURNS TO ENSURE THAT NOTHING ELSE IS REQUIRED. |
| 04/18/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
1) LOOKED AT MULTIPLE CMP AND SRP ROAD CROSSINGS AT THE SITE. VERIFIED THE SIZE OF PIPE, MATERIAL, PROPER GRADE, AND INSTALLATION FOR THE PIPE. ALL CONSTRUCTED PER APPROVED PLAN.
2) CONTINUE TO ENSURE INSPECTIONS ARE COMPLETED PRIOR TO COVERING PIE OR CATCH BASINS.
3) OK TO COVER SECTIONS OF PIPE THAT WERE INSPECTED - PICTURES TAKEN |
| 03/20/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS . |
| 02/28/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/15/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/06/2017 |
SITE - Stormwater Follow-up
|
RLEDONN1 |
Continued |
Entered by RLEDONN1 - WORKING ON HOME LOTS AND ROADS. NO SWPP CONCERNS AT THIS TIME. |
| 01/31/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STILL GRADING ON NORTH SIDE OF SITE. |
| 01/23/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/17/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |