Permit Details

Status:
Complete
Type:
Development Package
Address:
3808 N 1ST AV
Address NEW:
3808 N 1ST AV
Apply Date:
12/24/2012
Applicant:
Lisa Bowers
Description:
SITE/GRADING: SSA TUCSON

Permit Reviews

Permit Number - DP12-0239
Permit Status: Complete
Permit Description: SITE/GRADING: SSA TUCSON
Start Date Submittal Complete Date Status  
02/04/2014 REVISION - SITE 02/04/2014 COMPLETED Review Details
02/04/2014 REVISION - SITE 03/27/2014 COMPLETED Review Details
02/13/2013 RESUB - SITE and/or GRADING 04/02/2013 COMPLETED Review Details
03/14/2013 RESUB - SITE and/or GRADING 02/04/2014 COMPLETED Review Details
03/27/2014 REVISION - SITE 04/07/2014 COMPLETED Review Details
04/02/2013 RESUB - SITE and/or GRADING 04/09/2013 COMPLETED Review Details
04/07/2014 REVISION - SITE 04/25/2014 COMPLETED Review Details
12/24/2012 DEV PKG - OK TO SUBMIT 12/24/2012 COMPLETED Review Details
12/24/2012 SITE and/or GRADING 02/13/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0239
Permit Description: SITE/GRADING: SSA TUCSON
Total Completed Inspections - 7
Date Description Inspector Results Comments
05/13/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -

MET WITH SUPERINTENDENT ON SITE TO DISCUSS INSTALLATION OF SEDIMENT CONTROLS AND NPPO REQUIREMENTS.

1) INSTALL SEDIMENT CONTROLS PER PLAN - CALL FOR RE-INSPECTION WHEN COMPLETE
2) MARK PLANTS AND TREES FOR PRESERVE IN PLACE REQUIREMENTS. CALL FOR RE-INSPECTION
3) INSTALL CONCRETE/MATERIALS WASH OUT ON SITE
4) POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO SITE
5) SWEEP UP TRACKING AS NEEDED
6) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PLAN}
05/20/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 05/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS PER THE SITE SWPPP.
2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) INSTALL A CONCRETE WASH OUT AS SOON AS PRACTIABLE}
01/23/2014 SITE - Stormwater Follow-up Passed {Activity date: 01/23/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN
3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN
4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION.
5) WHEN SITE HAS BEEN STABILIZE, FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 01/14/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICABT STORM WATER CONCERNS ATTHIS TIME} ; {Activity date: 12/18/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED BIKE PARKING INSTALL PER PLAN
2) INSPECTED SOUTH SIDE OF BLDG W/ DOWNSPOUTS AND WALL OPENING
3) INSPECTED FOOTINGS AND FORMS FOR FLAG POLE BASE.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) PROVIDE A CETIFICATION STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING SHOWING CHANGES MADE} ; {Activity date: 11/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/02/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/24/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-INSTALL SEDIMENT CONTROLS ALONG THE FRONT (NW) SIDE OF THE SITE PERIMETER.
2) ENSURE STORMWATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
3) NO SIGNIFICANT SITE WORK IS BEING DONE AT THIS TIME.
4) PROPOSED CHANGE TO MOVE PERIMETER WALL AT SOUTH-SE SIDE IN 2', ELIMINATING EXISTING MESQUITE TREES. CONTRACTOR MUST REPLACE WITH LIKE TREES TO MEET LANDSCAPING/NPPO REQUIREMENTS.
5) RET/DET BASIN ROUGHED-IN, TRASH ENSLOSURE FLOOR POURED} ; {Activity date: 08/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CONCERNS OR PROBLEMS} ; {Activity date: 08/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
2) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAYS
3) SEDIMENT CONTROLS ALONG THE WEST SIDE HAVE BEEN TEMP REMOVED DURING ROW CONSTRUCTION
4) DISPOSE OF CONCRETE WASTE PROPERLY WHEN CONCRETE WASH OUTIS FULL} ; {Activity date: 07/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/09/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) NO SITE WORK AT THIS TIME, BLDG PADS POURED AND DRAINAGE HAS BEEN ROUGH GRADED
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 06/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
NEW PORTABLE WASH OUT ON SITE
NO SIGNIFICANT SITE WORK AT THIS TIME} ; {Activity date: 06/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORM WATER CONCERNS.
2) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS AND A STABILIZED CONSTRUCTION ENTRANCE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER APPROVED PLAN
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE.
5) MAINTAIN SEDIMENT CONTROLS AS NEEDED
6) CONTRACTOR WORKING ON SUBGRADE FOR BLDG PAD
7) NPPO COMPLETED - WILL HAVE TO DISCUSS CHANGES WITH JOE LINDVILLE (COT - LANDSCAPE ARCH).} ; {Activity date: 05/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
CONTRACTOR WORKING SOIL FOR BLDG PAD}
02/04/2014 ENGR Grading Final Passed {Activity date: 02/04/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/14/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE ANY AND ALL CHANGES MADE TO THE ORIGINAL SITE GRADING PLAN MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE CITY OF TUCSON.
2) CHANGES INCLUDE BUT ARE NOT LIMITED TO : PERIMETER WALL LOCATION, PARKING LOT MATERIAL USED FOR PAVING, DRAINAGE ALONG THE SOUTH PERIMETER....}
02/13/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/04/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AWAITING COT APPROVAL FOR CHANGES MADE TO THE ORIGINAL APPROVED LANDSCAPE PLAN
2) COMPLETE INSTALL OF ROCK AND HYDROSEED} ; {Activity date: 01/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN
3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN
4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION.
5) WHEN SITE HAS BEEN STABILIZE, FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 08/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TREES IDENTIFIED AS BEING PRESERVED IN PLACE ALONG THE SOUTH PERIMETER OF THE SITE MUST BE REMOVED DUE TO THE LOCATION OF THE NEW BLOCK PERIMETER WALL BEING CONSTRUCTED.
2) ENSURE LIKE TREES ARE PLANTED IN THIER PLACE} ; {Activity date: 06/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORM WATER CONCERNS.
2) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS AND A STABILIZED CONSTRUCTION ENTRANCE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER APPROVED PLAN
4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE.
5) MAINTAIN SEDIMENT CONTROLS AS NEEDED
6) CONTRACTOR WORKING ON SUBGRADE FOR BLDG PAD
7) NPPO COMPLETED - WILL HAVE TO DISCUSS CHANGES WITH JOE LINDVILLE (COT - LANDSCAPE ARCH).}
02/13/2014 SITE - Stormwater Final Inspection Passed {Activity date: 02/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU FILE YOUR NOTICE OF TERMINATION} ; {Activity date: 02/04/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AWAITING COT APPROVAL FOR CHANGES MADE TO THE ORIGINAL APPROVED LANDSCAPE PLAN
2) COMPLETE INSTALL OF ROCK AND HYDROSEED} ; {Activity date: 01/23/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN
3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN
4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION.
5) WHEN SITE HAS BEEN STABILIZE, FILE A NOTICE OF TERMINATION WITH ADEQ}
04/28/2014 ENGR Engineering Final Passed {Activity date: 04/28/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR COMPLETED SITE/GRADING PER THE APPROVED PLANS} ; {Activity date: 04/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RE-BAR LAYOUT FOR FOOTING OF ADDED WALL ALONG THE NE CORNER - RE-BAR INSTALLED PER PLAN} ; {Activity date: 04/16/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOME REVISED SITE/LANDSCAPING.
2) MAJORITY OF SITE IS COMPLETED, CONTRACTOR WORKING ON CHANGES MADE TO GRADING/LANDSCAPE PLAN} ; {Activity date: 04/09/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR TO MAKE CHANGES - ADD BLOCK WALL ALONG NE CORNER.
2) ENSURE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS BUILT IS AVAILABLE FINAL INSPECTION.
3) PROVIDE A REVISED DRAWING SHOWING CHANGES MADE TO THE LANDSCAPING PLAN.
4) PROVIDE A CERT. STATEMENT FROM THE ENG OF RECORD} ; {Activity date: 04/02/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE AS-BUILT DRAWING AND ENG CERT, ALSO PROVIDE REVISED PLAN FROM LANDSCAPE ARCH} ; {Activity date: 02/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL GRADING INSPECTION REQUEST} ; {Activity date: 02/04/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PARTIAL APPROVAL, AWAITING LANDSCAPE COMPLETETION} ; {Activity date: 01/23/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN
3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN
4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION.} ; {Activity date: 12/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED BIKE PARKING INSTALL PER PLAN
2) INSPECTED SOUTH SIDE OF BLDG W/ DOWNSPOUTS AND WALL OPENING
3) INSPECTED FOOTINGS AND FORMS FOR FLAG POLE BASE.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) PROVIDE A CETIFICATION STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING SHOWING CHANGES MADE}

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
None DOCUMENTS VIEW
001_COVER SHEET_1 OF 11.TIF DEVPLANS VIEW
002_SITE/PARKING/RIGHT OF WAY DETAILS_2 OF 11.TIF DEVPLANS VIEW
003_GRADES/UTILITIES/NOTES_3 OF 11.TIF DEVPLANS VIEW
004_DETAILS_4 OF 11.TIF DEVPLANS VIEW
005_NPPP_N1 5 OF 11.TIF DEVPLANS VIEW
006_LANDSCAPE_L1 6 OF 11.TIF DEVPLANS VIEW
007_WATER HARVESTING_L2 7 OF 11.TIF DEVPLANS VIEW
008_IRRIGATION_L3 8 OF 11.TIF DEVPLANS VIEW
009_LANDSCAPE DETAILS_L4 9 OF 11.TIF DEVPLANS VIEW
010_IRRIGATION DETAILS_L5 10 OF 11.TIF DEVPLANS VIEW
011_SPPP_11 OF 11.TIF DEVPLANS VIEW