Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP12-0239

Parcel: Unknown


Addresses:

3808 N 1ST AV

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
01/23/2014 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN 3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN 4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION. 5) WHEN SITE HAS BEEN STABILIZE, FILE A NOTICE OF TERMINATION WITH ADEQ
01/14/2014 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
12/31/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICABT STORM WATER CONCERNS ATTHIS TIME
12/18/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/11/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED BIKE PARKING INSTALL PER PLAN 2) INSPECTED SOUTH SIDE OF BLDG W/ DOWNSPOUTS AND WALL OPENING 3) INSPECTED FOOTINGS AND FORMS FOR FLAG POLE BASE. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 5) PROVIDE A CETIFICATION STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING SHOWING CHANGES MADE
11/22/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/19/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/12/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
11/07/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
10/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
10/14/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
10/02/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
09/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) RE-INSTALL SEDIMENT CONTROLS ALONG THE FRONT (NW) SIDE OF THE SITE PERIMETER. 2) ENSURE STORMWATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) NO SIGNIFICANT SITE WORK IS BEING DONE AT THIS TIME. 4) PROPOSED CHANGE TO MOVE PERIMETER WALL AT SOUTH-SE SIDE IN 2', ELIMINATING EXISTING MESQUITE TREES. CONTRACTOR MUST REPLACE WITH LIKE TREES TO MEET LANDSCAPING/NPPO REQUIREMENTS. 5) RET/DET BASIN ROUGHED-IN, TRASH ENSLOSURE FLOOR POURED
08/23/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CONCERNS OR PROBLEMS
08/15/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 2) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAYS 3) SEDIMENT CONTROLS ALONG THE WEST SIDE HAVE BEEN TEMP REMOVED DURING ROW CONSTRUCTION 4) DISPOSE OF CONCRETE WASTE PROPERLY WHEN CONCRETE WASH OUTIS FULL
07/23/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/09/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE WORK AT THIS TIME, BLDG PADS POURED AND DRAINAGE HAS BEEN ROUGH GRADED 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
06/26/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
06/13/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME NEW PORTABLE WASH OUT ON SITE NO SIGNIFICANT SITE WORK AT THIS TIME
06/04/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO STORM WATER CONCERNS. 2) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS AND A STABILIZED CONSTRUCTION ENTRANCE. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER APPROVED PLAN 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 5) MAINTAIN SEDIMENT CONTROLS AS NEEDED 6) CONTRACTOR WORKING ON SUBGRADE FOR BLDG PAD 7) NPPO COMPLETED - WILL HAVE TO DISCUSS CHANGES WITH JOE LINDVILLE (COT - LANDSCAPE ARCH).
05/21/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTOR WORKING SOIL FOR BLDG PAD