Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP12-0239

Parcel: Unknown


Addresses:

3808 N 1ST AV

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
01/23/2014 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) PROVIDE AN APPROVED AS-BUILT DRAWING THAT SHOWS WHAT WAS CONSTRUCTED 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT SITE/GRADING WAS COMPLETED PER THE APPROVED PLAN 3) COMPLETE ALL SITE/GRADING/LANDSCAPING PER PLAN 4) NPPO: PLANT LIKE TREES FOR THE TREES UNABLE TO BE SAVED OR MOVED DUE TO CONSTRUCTION.
01/13/2014 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MET WITH THE SITE SUPERINTENDENT AND WALKED THE SITE TO SEE WHAT TYPE OF WORK HE IS DOING AT THIS TIME. THEY ARE WORKING ON THE DRAINAGE ASPECTS THROUGHOUT THE SIT, AND GRADING THE PARKING LOT ON THE EAST SIDE OF THE SITE. THEY ARE PREPARING TO PLACE ASPHALT IN THE PARKING AREA EITHER ON FRIDAY OR THE FIRST PART OF MEXT WEEK. MIKE WILL BE OUT TO THIS SITE LATER ON THIS WEEK TO ENSURE THAT ALL WORK IS COMPLETE PRIOR TO PLACEMENT OF THE ASPHALT.
12/31/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE/GRADING CHANGES AND/OR CONCERNS
12/18/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK AT THIS TIME
12/11/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED BIKE PARKING INSTALL PER PLAN 2) INSPECTED SOUTH SIDE OF BLDG W/ DOWNSPOUTS AND WALL OPENING 3) INSPECTED FOOTINGS AND FORMS FOR FLAG POLE BASE. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 5) PROVIDE A CETIFICATION STATEMENT FROM THE EOR AND AN AS-BUILT DRAWING SHOWING CHANGES MADE
11/22/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - RE-BAR LAY OUT AND FOOTINGS FOR TRASH ENCLOSURE APRON AND FLOOR - OK PER APPROVED PLANS. NO OTHER CHANGES AND/OR CONCERNS AT THIS TIME
11/19/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - INSPECTION CALLED IN FOR CONSTRUCTION OF VERT CURBING AND UPDATE ON SITE WORK 1) PROVIDE AN APPROVED DRAWING SHOWING CHANGES MADE TO SITE WORK. 2) FORMS FOR VERT CURBING - OK
11/12/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
11/07/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
10/24/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - CONTRACTOR CONSTRUCTING THE RET/DET BASIN ALONG FIRST AVE AND THE CONNECTING DRAINAGE CHANNEL ALONG THE SOUTH SIDE OF THE BLDG. CONTRACTOR ALSO WORKING ON THE ADJACENT ACCESS ROADWAY.
10/14/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) ENSURE ANY AND ALL CHANGES MADE TO THE ORIGINAL SITE GRADING PLAN MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE CITY OF TUCSON. 2) CHANGES INCLUDE BUT ARE NOT LIMITED TO : PERIMETER WALL LOCATION, PARKING LOT MATERIAL USED FOR PAVING, DRAINAGE ALONG THE SOUTH PERIMETER....
10/14/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - RE-BAR LAYOUT FOR PERIMETER WALL PER APPROVED PLAN - OK TO POUR FOOTING.
10/02/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME
09/24/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) RE-INSTALL SEDIMENT CONTROLS ALONG THE FRONT (NW) SIDE OF THE SITE PERIMETER. 2) ENSURE STORMWATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) NO SIGNIFICANT SITE WORK IS BEING DONE AT THIS TIME. 4) PROPOSED CHANGE TO MOVE PERIMETER WALL AT SOUTH-SE SIDE IN 2', ELIMINATING EXISTING MESQUITE TREES. CONTRACTOR MUST REPLACE WITH LIKE TREES TO MEET LANDSCAPING/NPPO REQUIREMENTS. 5) RET/DET BASIN ROUGHED-IN, TRASH ENSLOSURE FLOOR POURED
08/23/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - INSPECTED RE-BAR LAYOUT OF DOUBLE TRASH ENCLOSURE LAY OUT - INSTALLED PER PLAN OK TO POUR CONCRETE
08/15/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONCRETE WALLS HAVE BEEN ERECTED FOR THE BLDG 2) THE CONCRETE SIGN WILL BE FORMED AND POURED THIS WEEK - A PROPER PERMIT FOR THE SIGN HAS BEEN OBTAINED 3) ROW WORK THIS WEEK
07/26/2013 ENGR Grading Final MRUSSO Partial Approval Entered by DROBERT5 - FOOTING AND RE-BAR LAYOUT FOR SIGN INSTALL. OK TO POUR CONCRETE
07/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - FOLLOW UP INSPECTION, NO CONCERNS AT THIS TIME
07/23/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE WORK AT THIS TIME
07/09/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE WORK AT THIS TIME, BLDG PADS POURED AND DRAINAGE HAS BEEN ROUGH GRADED 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
06/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - CONTRACTOR POURING BLDG PAD AND ROUGHING IN SITE WORK
06/13/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME NEW PORTABLE WASH OUT ON SITE NO SIGNIFICANT SITE WORK AT THIS TIME
06/04/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NO STORM WATER CONCERNS. 2) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS AND A STABILIZED CONSTRUCTION ENTRANCE. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER APPROVED PLAN 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 5) MAINTAIN SEDIMENT CONTROLS AS NEEDED 6) CONTRACTOR WORKING ON SUBGRADE FOR BLDG PAD 7) NPPO COMPLETED - WILL HAVE TO DISCUSS CHANGES WITH JOE LINDVILLE (COT - LANDSCAPE ARCH).
05/21/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTOR WORKING SOIL FOR BLDG PAD
02/04/2014 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
10/14/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) ENSURE ANY AND ALL CHANGES MADE TO THE ORIGINAL SITE GRADING PLAN MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE CITY OF TUCSON. 2) CHANGES INCLUDE BUT ARE NOT LIMITED TO : PERIMETER WALL LOCATION, PARKING LOT MATERIAL USED FOR PAVING, DRAINAGE ALONG THE SOUTH PERIMETER....