Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) CONTRACTOR INSTALLED PERIMETER SEDIMENT CONTROLS PER THE SITE SWPPP.
2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) INSTALL A CONCRETE WASH OUT AS SOON AS PRACTIABLE |