Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
04/26/2012
Applicant:
Chuck Martin
Description:
THE PLACE AT PRESIDIO TRAILSOriginally approved 9/25/20121st revision approved 11/5/2015 (page

Permit Reviews

Permit Number - DP12-0061
Permit Status: Complete
Permit Description: THE PLACE AT PRESIDIO TRAILSOriginally approved 9/25/20121st revision approved 11/5/2015 (page
Start Date Submittal Complete Date Status  
04/26/2012 DEV PKG - OK TO SUBMIT 04/26/2012 COMPLETED Review Details
04/26/2012 SITE and/or GRADING 06/08/2012 COMPLETED Review Details
06/14/2012 DEV PKG - RESUBMITTAL 07/26/2012 COMPLETED Review Details
07/26/2012 DEV PKG - RESUBMITTAL 08/01/2012 COMPLETED Review Details
08/01/2012 DEV PKG - RESUBMITTAL 09/19/2012 COMPLETED Review Details
09/19/2012 DEV PKG - RESUBMITTAL 02/18/2015 COMPLETED Review Details
10/23/2015 DEV PKG - REVISION 11/05/2015 COMPLETED Review Details
12/21/2015 DEV PKG - REVISION 12/21/2015 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0061
Permit Description: THE PLACE AT PRESIDIO TRAILSOriginally approved 9/25/20121st revision approved 11/5/2015 (page
Total Completed Inspections - 10
Date Description Inspector Results Comments
02/26/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/26/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR PLAN.
3) INSTALL A CONCRETE/MATERIALS WASH OUT PER YOUR SWPPP.
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR PLAN
5) CALL FOR INSPECTION FOR ANY SITE/GRADING CONCERNS AND/OR CHANGES OR UNDERGROUND STORM WATER WORK.} ; {Activity date: 02/25/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT AND DEVELOPER ON SITE.
2) NO APPROVED PLANS OR PERMIT ON SITE WILL RE-SCHEDULE
3) CONTRACTOR INSTALLING PERIMETER SEDIMENT CONTROLS PER SWPPP.}
03/11/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 03/11/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED PER APPROVED PLAN} ; {Activity date: 02/26/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME SEDIMENT CONTROLS HAVE BEEN INSTALLED}
03/15/2016 COT - ENGR - Site - Assurance Release Passed {Activity date: 03/15/2016; Status: Approved; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - } ; {Activity date: 01/02/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY}
06/28/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 02/26/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE NPPO IS BEING IMPLEMENTED, HOWEVER A MONITORING REPORT WILL BE REQUIRED FROM THE LANDSCAPE ARCHITECT}
06/28/2016 ENGR Engineering Final Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - RECEIVED THE CERT LETTER FROM THE ENG OF RECORD, SOME SMALL PUNCHLIST ITEMS LEFT.} ; {Activity date: 03/15/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT SITE GRADING AND LANDSCAPING WAS COMPLETED PER THE APPROVED PLANS}
06/28/2016 SITE - Stormwater Follow-up Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 03/17/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) RELEASE FOR OCCUPANCY FOR BLDG #4
2) CONTINUE TO SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/15/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - PRIOR TO FINAL, STABILIZE THE SITE AND FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 02/19/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS ITEM.} ; {Activity date: 02/08/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS 100% STABILIZED} ; {Activity date: 06/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WAS ISSUED A COMPLAINT FROM ADEQ FOR STORM WATER VIOLATIONS.
2) MET WITH THE CONTRACTOR, AND COT TRANSPORTAION, INSPECTED THE SITE FOR STORM WATER COMPLIANCE.
3) THE CONSTRUCTION SITE IS NOW IN COMPLIANCE WITH THERE SWPPP
4) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
5) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS STABILIZED} ; {Activity date: 06/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON UTILITIES AND BLDG PADS, NO SITE WORK AT THIS TIME
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE CONTROLS ARE MAINTAINED THRROUGHOUT CONSTRUCTION} ; {Activity date: 04/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TOOK PCTURES OF CATCH BASINS AND UNDERGROUND RET/DET BASIN
2) COMPARED STORM DRAINAGE WITH APPROVED PLANS
3) NEED TO MAINTAIN WADDLE ALONG PERIMETER ON SOUTH SIDE OF SITE} ; {Activity date: 03/27/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR FORMED THE FLOOR FOR THE TYPE 4 CATCH BASIN LOCATED ALONG THE NORTHWEST CORN OF THE SITE
2) PCTURES TAKEN
3) WILL RE-INSPECT FORMS FOR ALL CATCH BASINS PRIOR TO CONCRETE
4) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 03/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
06/28/2016 ENGR Grading Final Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
06/28/2016 SITE - SWPPP Violation Notice Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 06/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH THE CONTRACTOR, AND COT TRANSPORTAION, INSPECTED THE SITE FOR STORM WATER COMPLIANCE.
2) THE CONSTRUCTION SITE IS NOW IN COMPLIANCE WITH THERE SWPPP
3) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS STABILIZED} ; {Activity date: 06/16/2015; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ADEQ AND THE COT TRANSPORTATION DEPT FILED A COMPLAINT FOR SITE NON-COMPLIANCE WITH YOUR SWPPP
2) RE-ESTABLISH, REPLACE, OR REMOVE SEDIMENT CONTROLS ALONG GOLLOB RD IF CONSTRUCTION IS COMPLETE AND THE INSPECTOR APPROVES.
3) ALL SEDIMENT CONTROLS MUST BE MAINTAINED, INSPECTED AND REPLACED IF NECCESSARY PER YOUR SWPPP
4) STAGE PAVING EQUIPMENT ON SITE
5) CALL FOR RE-INSPECTION WHEN SWPPP CORECTIONS HAVE IMPLEMENTED.

NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION.}
06/28/2016 SITE - Stormwater Final Inspection Passed {Activity date: 06/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE A NOTICE OF TERMINATION IS FILED WITH ADEQ FOR COMPLIANCE}
01/09/2017 RSBU - Building Final Passed {Activity date: 01/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 39.TIF DEVELOPMENT PACKAGE VIEW
002_OVERALL SITE_2 OF 39.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING / PAVING NOTES_3 OF 39.TIF DEVELOPMENT PACKAGE VIEW
004_PRIVATE UTILITY NOTES_4 OF 39.TIF DEVELOPMENT PACKAGE VIEW
005_LANDSCAPE GENERAL NOTES_5 OF 39.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_6 OF 39.TIF DEVELOPMENT PACKAGE VIEW
007_SITE_7 OF 39.TIF DEVELOPMENT PACKAGE VIEW
008_SITE_8 OF 39.TIF DEVELOPMENT PACKAGE VIEW
009_UNIT ADDRESS/PEDESTRIAN ACCESSIBLE_9 OF 39.TIF DEVELOPMENT PACKAGE VIEW
010_GRADING / PAVING_10 OF 39.TIF DEVELOPMENT PACKAGE VIEW
011_GRADING / PAVING_11 OF 39.TIF DEVELOPMENT PACKAGE VIEW
012_GRADING / PAVING_12 OF 39.TIF DEVELOPMENT PACKAGE VIEW
013_GRADING / PAVING_13 OF 39.TIF DEVELOPMENT PACKAGE VIEW
014_UNIT SPECIFIC GRADING DETAILS_14 OF 39.TIF DEVELOPMENT PACKAGE VIEW
015_UNIT SPECIFIC GRADING DETAILS_15 OF 39.TIF DEVELOPMENT PACKAGE VIEW
016_SITE / GRADING /UTILITY DETAILS_16 OF 39.TIF DEVELOPMENT PACKAGE VIEW
017_SITE / GRADING DETAILS_17 OF 39.TIF DEVELOPMENT PACKAGE VIEW
018_SITE / GRADING DETAILS_18 OF 39.TIF DEVELOPMENT PACKAGE VIEW
019_HORIZONTAL CONTROL_19 OF 39.TIF DEVELOPMENT PACKAGE VIEW
020_HORIZONTAL CONTROL_20 OF 39.TIF DEVELOPMENT PACKAGE VIEW
021_HORIZONTAL CONTROL DATA TABLES_21 OF 39.TIF DEVELOPMENT PACKAGE VIEW
022_PRIVATE UTILITY_22 OF 39.TIF DEVELOPMENT PACKAGE VIEW
023_PRIVATE UTILITY_23 OF 39.TIF DEVELOPMENT PACKAGE VIEW
024_PRIVATE UTILITY_24 OF 39.TIF DEVELOPMENT PACKAGE VIEW
025_PRIVATE SEWER / PROFILE_25 OF 39.TIF DEVELOPMENT PACKAGE VIEW
026_PRIVATE SEWER / PROFILE_26 OF 39.TIF DEVELOPMENT PACKAGE VIEW
027_PRIVATE SEWER / PROFILE_27 OF 39.TIF DEVELOPMENT PACKAGE VIEW
028_LANDSCAPE DETAILS_28 OF 39.TIF DEVELOPMENT PACKAGE VIEW
029_LANDSCAPE PLANTING_29 OF 39.TIF DEVELOPMENT PACKAGE VIEW
030_LANDSCAPE PLANTING_30 OF 39.TIF DEVELOPMENT PACKAGE VIEW
031_LANDSCAPE PLANTING_31 OF 39.TIF DEVELOPMENT PACKAGE VIEW
032_LANDSCAPE PLANTING_32 OF 39.TIF DEVELOPMENT PACKAGE VIEW
033_LANDSCAPE IRRIGATION_33 OF 39.TIF DEVELOPMENT PACKAGE VIEW
034_LANDSCAPE IRRIGATION_34 OF 39.TIF DEVELOPMENT PACKAGE VIEW
035_LANDSCAPE IRRIGATION_35 OF 39.TIF DEVELOPMENT PACKAGE VIEW
036_LANDSCAPE IRRIGATION_36 OF 39.TIF DEVELOPMENT PACKAGE VIEW
037_NPPP_37 OF 39.TIF DEVELOPMENT PACKAGE VIEW
038_NPPP_38 OF 39.TIF DEVELOPMENT PACKAGE VIEW
039_SWPPP_39 OF 39.TIF DEVELOPMENT PACKAGE VIEW