Inspection History: ENGR Grading Final
Permit Number - DP12-0061
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/18/2016 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - CREW IS POURING THE CONCRETE SLAB FOR THE TRASH ENCLOSURE LOCATED IN THE SOUTHWEST CORNER OF THE SITE. |
02/08/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - STARTING TO PREP THE AREA FOR THE ON GRADE SLAB |
06/28/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
06/28/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
03/17/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) RELEASE FOR OCCUPANCY FOR BLDG #4 2) CONTINUE TO SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
02/19/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS ARE WORKING ON SITE PREP FOR ADDITIONAL BUILDINGS THAT WILL BE REQUESTED FOR RELEASE NEXT WEEK.CONTINUE TO REMIND THEM TO ENSURE THAT THEY HAVE SCUPPERS IN ALL THE AREAS THAT ARE EITHER CALLED OUT ON THE APPROVED PLANS, OR IN AREAS WHERE IT WAS MISSED. I WILL DO A WALK THROUGH OF PORTION OF THE SITE NEXT WEEK PRIOR TO A REQUEST FOR ADDITIONAL RELEASES. |
02/19/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS WORKING IN THE AREA AROUND THE POOL AND THROUGH OUT THE SITE ON GENERAL YARD WORK. |
09/21/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - INSPECTED COMPLETED SITE WORK, WILL REVIEW PLANS FOR COMPLIANCE. NO OBVIOUS CONCERNS AT THIS TIME |
08/21/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NEED TO LOOK AT WALL/SLOPE ALONG THE EAST PERIMETER 2) ENSURE CONTRACTOR PROTECTS ALL CATCH BASINS 3) ENSURE CURB CUTS ARE IN THE RIGHT LOCATION |
06/08/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WORKING ON UTILITIES AND BLDG PADS, NO SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
05/05/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) WALKED SITE, TOOK PICS OF STORM WATER CONVEYANCE SYSTEM AND STORM WATER SEDIMENT CONTROLS. 2) ENSURE THE CONSTRUCTED STORM WATER PIPING AND RET/DEET IS FREE OF CONSTRUCTION DEBRI PRIOR TO FINAL APPROVAL 3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD PRIOR TO FINAL APPROVAL |
04/22/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) TOOK PCTURES OF CATCH BASINS AND UNDERGROUND RET/DET BASIN 2) COMPARED STORM DRAINAGE WITH APPROVED PLANS 3) NEED TO MAINTAIN WADDLE ALONG PERIMETER ON SOUTH SIDE OF SITE |
03/27/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1. CONTRACTOR FORMED THE FLOOR OF THE TYPE 4 CATCH BASIN ALONG THE NW CORNER OF THE SITE 2. PICTURE TAKE 3. WILL INSPECT FORMS FOR ALL CATCH BASINS |
03/11/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLING UNDERGROUND RET/DET BASIN PER PLAN. PICTURES TAKEN 2) WILL RE-INSPECT |