Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - SWPPP Violation Notice
Permit Number - DP12-0061
Inspection Description - SITE - SWPPP Violation Notice
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2016 | SITE - SWPPP Violation Notice | MRUSSO | Approved | Entered by MRUSSO1 - |
06/17/2015 | SITE - SWPPP Violation Notice | MRUSSO | Continued | Entered by DROBERT5 - 1) MET WITH THE CONTRACTOR, AND COT TRANSPORTAION, INSPECTED THE SITE FOR STORM WATER COMPLIANCE. 2) THE CONSTRUCTION SITE IS NOW IN COMPLIANCE WITH THERE SWPPP 3) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS STABILIZED |
06/16/2015 | SITE - SWPPP Violation Notice | MRUSSO | Correction Required | Entered by DROBERT5 - 1) ADEQ AND THE COT TRANSPORTATION DEPT FILED A COMPLAINT FOR SITE NON-COMPLIANCE WITH YOUR SWPPP 2) RE-ESTABLISH, REPLACE, OR REMOVE SEDIMENT CONTROLS ALONG GOLLOB RD IF CONSTRUCTION IS COMPLETE AND THE INSPECTOR APPROVES. 3) ALL SEDIMENT CONTROLS MUST BE MAINTAINED, INSPECTED AND REPLACED IF NECCESSARY PER YOUR SWPPP 4) STAGE PAVING EQUIPMENT ON SITE 5) CALL FOR RE-INSPECTION WHEN SWPPP CORECTIONS HAVE IMPLEMENTED. NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |