Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/26/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR PLAN.
3) INSTALL A CONCRETE/MATERIALS WASH OUT PER YOUR SWPPP.
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR PLAN
5) CALL FOR INSPECTION FOR ANY SITE/GRADING CONCERNS AND/OR CHANGES OR UNDERGROUND STORM WATER WORK. |
| 02/25/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT AND DEVELOPER ON SITE.
2) NO APPROVED PLANS OR PERMIT ON SITE WILL RE-SCHEDULE
3) CONTRACTOR INSTALLING PERIMETER SEDIMENT CONTROLS PER SWPPP. |