Permit: DP12-0061

Parcel: 99999999A

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP12-0061

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
06/28/2016 SITE - Stormwater Follow-up MRUSSO Approved Entered by MRUSSO1 -
03/17/2016 SITE - Stormwater Follow-up MRUSSO1 Continued Entered by MRUSSO1 - 1) RELEASE FOR OCCUPANCY FOR BLDG #4 2) CONTINUE TO SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/15/2016 SITE - Stormwater Follow-up MRUSSO1 Prior to Final Inspectn Entered by MRUSSO1 - PRIOR TO FINAL, STABILIZE THE SITE AND FILE A NOTICE OF TERMINATION WITH ADEQ
02/19/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS ITEM.
02/08/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
09/21/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS 100% STABILIZED
06/17/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WAS ISSUED A COMPLAINT FROM ADEQ FOR STORM WATER VIOLATIONS. 2) MET WITH THE CONTRACTOR, AND COT TRANSPORTAION, INSPECTED THE SITE FOR STORM WATER COMPLIANCE. 3) THE CONSTRUCTION SITE IS NOW IN COMPLIANCE WITH THERE SWPPP 4) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 5) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS STABILIZED
06/08/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WORKING ON UTILITIES AND BLDG PADS, NO SITE WORK AT THIS TIME 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/05/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE CONTROLS ARE MAINTAINED THRROUGHOUT CONSTRUCTION
04/22/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) TOOK PCTURES OF CATCH BASINS AND UNDERGROUND RET/DET BASIN 2) COMPARED STORM DRAINAGE WITH APPROVED PLANS 3) NEED TO MAINTAIN WADDLE ALONG PERIMETER ON SOUTH SIDE OF SITE
03/27/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR FORMED THE FLOOR FOR THE TYPE 4 CATCH BASIN LOCATED ALONG THE NORTHWEST CORN OF THE SITE 2) PCTURES TAKEN 3) WILL RE-INSPECT FORMS FOR ALL CATCH BASINS PRIOR TO CONCRETE 4) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
03/11/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME