Parcel Search: 13727643A
Parcel Search
Parcel Attributes
| Parcel | 13727643A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Midvale Park |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/23/2026 3:15 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 11/23/2026 3:15 a.m.
Total Number Of Special Development Permits - (3)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000003325 | Closed | N/A | |||
| T11SA00024 | Complete | N/A | |||
| T20SA00099 | Complete | N/A | ZONING COMPLIANCE LETTER |
Permits
Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Permits - (18)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22CM03486 | Issued | 05/06/2022 | 06/20/2023 | Commercial Building | Provide 5 new panels for new gate power around complex | |
| T21CM04817 | Expired | 06/09/2021 | 12/12/2021 | 129 | Commercial Building | T21DV03312 reconnect electric after building fire |
| T21CM04826 | Expired | 06/09/2021 | 12/12/2021 | 329 | Commercial Building | T21DV03308 Reconnect electric after building fire |
| TR-FBR-1126-00055 | Issued | 11/18/2026 | 01/19/2027 | Fiber Permit | Proofing on south side of Valencia rd (I-10 west to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. | |
| TR-FBR-1126-00060 | Fees paid | 11/18/2026 | N/A | Fiber Permit | Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. | |
| T10CM03020 | Final | 10/28/2010 | 07/17/2011 | #335 | COMBO | REPAIRS: FIRE DAMAGE - REPAIR AND REPLACE LIKE FOR LIKE |
| T12CM07844 | Final | 12/12/2012 | 09/01/2013 | #253 | COMBO | FIRE/SMOKE DAMAGED APT. T12DV10191 |
| T16CM04077 | Final | 05/31/2016 | 12/11/2016 | COMBO | LIGHT IN POOL - T16DV03044 | |
| T16CM06422 | Final | 08/18/2016 | 02/19/2017 | #137 | COMBO | ELECTRICAL RECONNECT |
| T17RW01481 | Final | 04/04/2017 | 04/20/2017 | ROW | REPLACED BAD TRANSFORMER AS AN EMERGENCY ON 3/21/17 | |
| T18CM05408 | Final | 07/11/2018 | 01/12/2019 | #380 | COMBO | ELECTRIC RECONNECT |
| T19RW02735 | Final | 05/15/2019 | 08/12/2019 | ROW | DEMO EXISTING DRIVEWAY AND ADD NEW SIDEWALK TO MEET EXISTING WORK IS ON HEADLEY RD | |
| T21CM04816 | Final | 06/09/2021 | 02/28/2022 | 130 | COMBO | T21DV03311 Reconnect electric after building fire |
| T21CM04818 | Final | 06/09/2021 | 02/28/2022 | 131 | COMBO | T21DV03310 Reconnect electric after building fire |
| T21CM04819 | Final | 06/09/2021 | 01/04/2022 | 132 | COMBO | T21DV03309 Reconnect electric after building fire |
| T21CM04827 | Final | 06/09/2021 | 03/07/2022 | 330 | COMBO | T21DV03307 Reconnect electric after building fire |
| T21CM04828 | Final | 06/09/2021 | 03/07/2022 | 332 | COMBO | T21DV03306 Reconnect electric after building fire |
| T21CM05702 | Final | 07/13/2021 | 04/09/2022 | COMBO | (T21DV03302) FIRE DAMAGE REMEDIATION |
Code Enforcement
Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Code Cases - 17
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T10DV05818 | Complian | 08/30/2010 | N/A | #335 | DNR_VIOL | APARTMENT FIRE |
| T10DV05822 | Complian | 08/30/2010 | N/A | #336 | DNR_VIOL | APARTMENT FIRE |
| T12DV10191 | Complian | 11/05/2012 | N/A | #253 | DNR_VIOL | APT FIRE |
| T15DV06972 | Complian | 09/21/2015 | N/A | DNR_VIOL | CEILING IS LEAKING | |
| T16DV03044 | Complian | 05/20/2016 | N/A | DNR_VIOL | POOL DOES NOT HAVE A LIGHT. CONCERNED FOR SAFETY OF CHILDREN | |
| T17DV00038 | Complian | 01/05/2017 | N/A | #440 | DNR_VIOL | MOUSE INFESTATION |
| T20DV00896 | Noverify | 02/07/2020 | N/A | DNR_VIOL | trees over hanging into roadway and sidewalk | |
| T20DV04536 | Complian | 07/02/2020 | N/A | DNR_VIOL | Fallen Tree Branch | |
| T21DV02569 | Complian | 05/01/2021 | N/A | DNR_VIOL | AC/ MALFUNCTIONED | |
| T21DV03302 | Complian | 06/02/2021 | N/A | DNR_VIOL | #331 APARTMENT FIRE | |
| T21DV03306 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 332 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03307 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 330 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03308 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 329 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03309 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 132 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03310 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 131 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03311 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 130 WATER DAMAGE FROM FIRE IN UNIT 331 | |
| T21DV03312 | Complian | 06/02/2021 | N/A | DNR_VIOL | UNIT 129 WATER DAMAGE FROM FIRE IN UNIT 331 |
Plans
Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Plans - 1
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-FTTP-1026-00019 | Approved | 10/28/2026 | 04/28/2027 | Fiber Plan Review | Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. |