Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Annexations & Original City Zoning (OCZ)

Date - 11/23/2026 3:15 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-83-34 Midvale Farms 5824 09/01/1983 5843

Special Development Requests & Requirements

Date - 11/23/2026 3:15 a.m.
Total Number Of Special Development Permits - (3)
Activity Number Status Apply Date Expired Date Type Description
H000003325 Closed N/A
T11SA00024 Complete N/A
T20SA00099 Complete N/A ZONING COMPLIANCE LETTER

Permits

Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Permits - (18)
Permit Permit Status Entered Date Expired Date Unit Type Description
T22CM03486 Issued 05/06/2022 06/20/2023 Commercial Building Provide 5 new panels for new gate power around complex
T21CM04817 Expired 06/09/2021 12/12/2021 129 Commercial Building T21DV03312 reconnect electric after building fire
T21CM04826 Expired 06/09/2021 12/12/2021 329 Commercial Building T21DV03308 Reconnect electric after building fire
TR-FBR-1126-00055 Issued 11/18/2026 01/19/2027 Fiber Permit Proofing on south side of Valencia rd (I-10 west to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
TR-FBR-1126-00060 Fees paid 11/18/2026 N/A Fiber Permit Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
T10CM03020 Final 10/28/2010 07/17/2011 #335 COMBO REPAIRS: FIRE DAMAGE - REPAIR AND REPLACE LIKE FOR LIKE
T12CM07844 Final 12/12/2012 09/01/2013 #253 COMBO FIRE/SMOKE DAMAGED APT. T12DV10191
T16CM04077 Final 05/31/2016 12/11/2016 COMBO LIGHT IN POOL - T16DV03044
T16CM06422 Final 08/18/2016 02/19/2017 #137 COMBO ELECTRICAL RECONNECT
T17RW01481 Final 04/04/2017 04/20/2017 ROW REPLACED BAD TRANSFORMER AS AN EMERGENCY ON 3/21/17
T18CM05408 Final 07/11/2018 01/12/2019 #380 COMBO ELECTRIC RECONNECT
T19RW02735 Final 05/15/2019 08/12/2019 ROW DEMO EXISTING DRIVEWAY AND ADD NEW SIDEWALK TO MEET EXISTING WORK IS ON HEADLEY RD
T21CM04816 Final 06/09/2021 02/28/2022 130 COMBO T21DV03311 Reconnect electric after building fire
T21CM04818 Final 06/09/2021 02/28/2022 131 COMBO T21DV03310 Reconnect electric after building fire
T21CM04819 Final 06/09/2021 01/04/2022 132 COMBO T21DV03309 Reconnect electric after building fire
T21CM04827 Final 06/09/2021 03/07/2022 330 COMBO T21DV03307 Reconnect electric after building fire
T21CM04828 Final 06/09/2021 03/07/2022 332 COMBO T21DV03306 Reconnect electric after building fire
T21CM05702 Final 07/13/2021 04/09/2022 COMBO (T21DV03302) FIRE DAMAGE REMEDIATION

Code Enforcement

Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Code Cases - 17
Case Number Case Status Entered Date Closed Date Unit Type Description
T10DV05818 Complian 08/30/2010 N/A #335 DNR_VIOL APARTMENT FIRE
T10DV05822 Complian 08/30/2010 N/A #336 DNR_VIOL APARTMENT FIRE
T12DV10191 Complian 11/05/2012 N/A #253 DNR_VIOL APT FIRE
T15DV06972 Complian 09/21/2015 N/A DNR_VIOL CEILING IS LEAKING
T16DV03044 Complian 05/20/2016 N/A DNR_VIOL POOL DOES NOT HAVE A LIGHT. CONCERNED FOR SAFETY OF CHILDREN
T17DV00038 Complian 01/05/2017 N/A #440 DNR_VIOL MOUSE INFESTATION
T20DV00896 Noverify 02/07/2020 N/A DNR_VIOL trees over hanging into roadway and sidewalk
T20DV04536 Complian 07/02/2020 N/A DNR_VIOL Fallen Tree Branch
T21DV02569 Complian 05/01/2021 N/A DNR_VIOL AC/ MALFUNCTIONED
T21DV03302 Complian 06/02/2021 N/A DNR_VIOL #331 APARTMENT FIRE
T21DV03306 Complian 06/02/2021 N/A DNR_VIOL UNIT 332 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03307 Complian 06/02/2021 N/A DNR_VIOL UNIT 330 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03308 Complian 06/02/2021 N/A DNR_VIOL UNIT 329 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03309 Complian 06/02/2021 N/A DNR_VIOL UNIT 132 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03310 Complian 06/02/2021 N/A DNR_VIOL UNIT 131 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03311 Complian 06/02/2021 N/A DNR_VIOL UNIT 130 WATER DAMAGE FROM FIRE IN UNIT 331
T21DV03312 Complian 06/02/2021 N/A DNR_VIOL UNIT 129 WATER DAMAGE FROM FIRE IN UNIT 331

Plans

Parcel Number - 13727643A
Date - 11/23/2026 3:15 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
TR-FTTP-1026-00019 Approved 10/28/2026 04/28/2027 Fiber Plan Review Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.