Address Search: 1970 W VALENCIA RD
Search
Parcel Attributes
| Parcel | 13727643A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Midvale Park |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1970 W VALENCIA RD
Date - 11/23/2026 3:16 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 1970 W VALENCIA RD
Date - 11/23/2026 3:16 a.m.
Total Number Of Special Development Permits - (3)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000003325 | CLOSED | 02/07/2011 | N/A | Historical Information | ||
| T11SA00024 | COMPLETE | 01/20/2011 | N/A | Zoning Adminstration Letter | ||
| T20SA00099 | COMPLETE | 03/18/2020 | N/A | Zoning Adminstration Letter | ZONING COMPLIANCE LETTER |
Permits
Address: 1970 W VALENCIA RD
Date - 11/23/2026 3:16 a.m.
Total Number Of Permits - (55)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-FBR-1126-00055 | Issued | 11/18/2026 | 01/19/2027 | Fiber Permit | Proofing on south side of Valencia rd (I-10 west to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. | |
| TR-FBR-1126-00060 | Fees Paid | 11/18/2026 | N/A | Fiber Permit | Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. | |
| T21CM04817 | Expired | 06/09/2021 | 12/12/2021 | 129 | Commercial Building | T21DV03312 reconnect electric after building fire |
| T21CM04826 | Expired | 06/09/2021 | 12/12/2021 | 329 | Commercial Building | T21DV03308 Reconnect electric after building fire |
| T22CM03486 | Issued | 05/06/2022 | 06/20/2023 | Commercial Building | Provide 5 new panels for new gate power around complex | |
| T01CM01588 | FINAL | 04/04/2001 | 10/31/2001 | #340 | COMBO | GENERAL REPAIR:FIRE DAMAGE |
| T01EX01244 | CLOSED | 10/31/2001 | 12/30/2001 | EXCAV | EXCAV:INSTALL 96LF OF DRIVEWAY | |
| T02CM00227 | FINAL | 01/15/2002 | 10/13/2002 | COMBO | REMODEL EXISTING OFFICE W/ EXPANSION INTO EXISTING APARTMENT 1302 SF SPACE , WOOD STUDS W/ GYP BD | |
| T05CM02165 | FINAL | 05/12/2005 | 07/05/2006 | #133 | COMBO | FIRE DAMAGE REPAIR FIRE DAMAGE # T05VL00388 |
| T05PL00457 | FINAL | 03/08/2005 | 09/07/2005 | #109 | PLUMB | REPIPE:WATER LINES |
| T05PL00505 | FINAL | 03/15/2005 | 09/20/2005 | #111 | PLUMB | REPIPE: INSIDE WATERLINES 8 APTS/ONE BLDG |
| T05PL00563 | FINAL | 03/24/2005 | 10/04/2005 | #117 | PLUMB | REPLACE:WATER LINES |
| T05PL00564 | EXPIRED | 03/24/2005 | 09/27/2005 | #119 | PLUMB | REPLACE:WATER LINES |
| T05PL00703 | EXPIRED | 04/11/2005 | 10/25/2005 | #133 | PLUMB | REPLACE:WATER LINE |
| T05PL00704 | FINAL | 04/11/2005 | 10/11/2005 | #137 | PLUMB | RPLACE:WATER LINES |
| T05PL00705 | FINAL | 04/11/2005 | 10/19/2005 | #135 | PLUMB | REPLACE:WATER LINES |
| T05PL00770 | EXPIRED | 04/21/2005 | 10/18/2005 | #129 | PLUMB | REPLACE: WATERLINE |
| T06EX01144 | CLOSED | 11/16/2006 | 01/15/2007 | EXCAV | TRENCH AND BORE 675 FOR CABLE | |
| T06PL00672 | FINAL | 04/25/2006 | 10/31/2006 | #101 | PLUMB | REPL: WATER PIPES |
| T06PL00695 | FINAL | 05/02/2006 | 10/30/2006 | #103 | PLUMB | REPLC: WTR PIPE (APA) |
| T06PL00767 | FINAL | 05/09/2006 | 11/07/2006 | #107 | PLUMB | REPLC: INTERIOR WTR REPIPE (APA) |
| T06PL00770 | FINAL | 05/09/2006 | 11/14/2006 | #105 | PLUMB | REPLC: INTERIOR WTR REPIPE |
| T06PL00938 | FINAL | 06/06/2006 | 12/06/2006 | #129 | PLUMB | REPLC: WTR PIPES (APA) |
| T06PL00954 | FINAL | 06/09/2006 | 12/12/2006 | #131 | PLUMB | REPLC: WTR PIPES (APA) |
| T06PL00955 | FINAL | 06/09/2006 | 12/21/2006 | #125 | PLUMB | REPLC: WTR PIPES (APA) |
| T06PL00956 | FINAL | 06/09/2006 | 12/26/2006 | #127 | PLUMB | REPLC: WTR PIPES (APA) |
| T06PL01141 | FINAL | 07/03/2006 | 01/02/2007 | #161 | PLUMB | REPIPE:WATER LINE APA |
| T06PL01142 | FINAL | 07/03/2006 | 01/09/2007 | #163 | PLUMB | WATER LINE:REPIPE APA |
| T06PL01265 | FINAL | 07/18/2006 | 01/17/2007 | #167 | PLUMB | WATER REPIPE (APA) |
| T06PL01266 | FINAL | 07/18/2006 | 01/30/2007 | #165 | PLUMB | WATER REPIPE (APA) |
| T06PL01413 | FINAL | 08/07/2006 | 02/06/2007 | #153 | PLUMB | REPL INTERIOR WATER LINES |
| T06PL01414 | FINAL | 08/07/2006 | 02/14/2007 | #155 | PLUMB | REPL INTERIOR WATER LINES |
| T06PL01415 | FINAL | 08/07/2006 | 02/20/2007 | #159 | PLUMB | REPL INTERIOR WATER LINES |
| T06PL01416 | FINAL | 08/07/2006 | 02/27/2007 | #157 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T06PL01417 | FINAL | 08/07/2006 | 03/27/2007 | #149 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T06PL01418 | FINAL | 08/07/2006 | 03/20/2007 | #151 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T06PL01419 | FINAL | 08/07/2006 | 03/13/2007 | #147 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T06PL01420 | EXPIRED | 08/07/2006 | 02/03/2007 | #350 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T06PL01421 | FINAL | 08/07/2006 | 03/06/2007 | #145 | PLUMB | REPLACE: INTERIOR WATER LINES |
| T07BU00989 | EXPIRED | 05/03/2007 | 01/16/2008 | BUILD | MONUMENT SIGN WALL | |
| T07OT01216 | FINAL | 05/22/2007 | 06/09/2008 | SIGN | 13152 | |
| T10CM03020 | FINAL | 10/28/2010 | 07/17/2011 | #335 | COMBO | REPAIRS: FIRE DAMAGE - REPAIR AND REPLACE LIKE FOR LIKE |
| T12CM07844 | FINAL | 12/12/2012 | 09/01/2013 | #253 | COMBO | FIRE/SMOKE DAMAGED APT. T12DV10191 |
| T15EX03629 | FINAL | 12/30/2015 | 02/28/2016 | EXCAV | SSAP ATLAS 0081 (17 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. TCP - INTERIOR: ALL 1 DAY WORK WITHIN APPROVED TIME ON ANNUAL BLANKET PERMIT T15TC01632 NO ARTERIAL STREETS FOR TC PER CONTRACTOR | |
| T16CM04077 | FINAL | 05/31/2016 | 12/11/2016 | COMBO | LIGHT IN POOL - T16DV03044 | |
| T16CM06422 | FINAL | 08/18/2016 | 02/19/2017 | #137 | COMBO | ELECTRICAL RECONNECT |
| T17RW01481 | FINAL | 04/04/2017 | 04/20/2017 | ROW | REPLACED BAD TRANSFORMER AS AN EMERGENCY ON 3/21/17 | |
| T18CM05408 | FINAL | 07/11/2018 | 01/12/2019 | #380 | COMBO | ELECTRIC RECONNECT |
| T19RW02735 | FINAL | 05/15/2019 | 08/12/2019 | ROW | DEMO EXISTING DRIVEWAY AND ADD NEW SIDEWALK TO MEET EXISTING WORK IS ON HEADLEY RD | |
| T21CM04816 | FINAL | 06/09/2021 | 02/28/2022 | 130 | COMBO | T21DV03311 Reconnect electric after building fire |
| T21CM04818 | FINAL | 06/09/2021 | 02/28/2022 | 131 | COMBO | T21DV03310 Reconnect electric after building fire |
| T21CM04819 | FINAL | 06/09/2021 | 01/04/2022 | 132 | COMBO | T21DV03309 Reconnect electric after building fire |
| T21CM04827 | FINAL | 06/09/2021 | 03/07/2022 | 330 | COMBO | T21DV03307 Reconnect electric after building fire |
| T21CM04828 | FINAL | 06/09/2021 | 03/07/2022 | 332 | COMBO | T21DV03306 Reconnect electric after building fire |
| T21CM05702 | FINAL | 07/13/2021 | 04/09/2022 | COMBO | (T21DV03302) FIRE DAMAGE REMEDIATION |
Plans
Address: 1970 W VALENCIA RD
Date - 11/23/2026 3:16 a.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-FTTP-1026-00019 | Approved | 10/28/2026 | 04/28/2027 | -- Fiber Plan Review | Proofing on Valencia rd (Headley rd to Del Moral Blvd) = 3.5 miles - For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. |