Permit: TR-PIA-1124-00018
Permit Details
Status:
Inspections Complete
Type:
Private Improvement Agreement (PIA)
Address:
6219 S SEARS BL
Address NEW:
6219 S SEARS BL
Apply Date:
11/01/2024
Applicant:
Chris Leon
Description:
Public Paving and Sewer Plan for Cielo Reserve
Permit Reviews
Permit Number - TR-PIA-1124-00018
Permit Status: Inspections complete
Permit Description: Public Paving and Sewer Plan for Cielo Reserve
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 03/07/2025 | REQUIRES RESUBMIT |
| 04/24/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 05/20/2025 | APPROVED |
| 11/07/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 12/17/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-PIA-1124-00018
Permit Status: Inspections complete
Permit Description: Public Paving and Sewer Plan for Cielo Reserve
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/19/2025 | Sidewalk Areas |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-PIA-1124-00018
Permit Description: Public Paving and Sewer Plan for Cielo Reserve
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2025 | TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | Passed | Earthwork is complete | |
| 10/29/2025 | TRSP - PIA - Roadway Subgrade | Passed | Subgrade is complete. | |
| 10/29/2025 | TRSP - PIA - AB Placement | Passed | AB placement is complete | |
| 12/10/2025 | TRSP - PIA - Curb Placement | Passed | This site has reached the final stage and no longer needs this inspection at this time. | |
| 02/12/2026 | TRSP - PIA - Paving Inspection | Passed | All paving is complete on this job site. There has been an extended warranty on the paving due to cores having too high void percentage. Site is now ready for a final walkthrough. | |
| 12/10/2025 | TRSP - PIA - Barricade - Setup/Takedown/Routine | Passed | This site has reached the final stage and no longer needs this inspection at this time. | |
| 12/03/2025 | TRSP - PIA - Pre-Paving Meeting/Inspection | Passed | ||
| 02/12/2026 | TRSP - PIA - Sidewalk Placement | Passed | All sidewalk pertaining to the PIA portion of the Cielo reserve subdivision has been completed. The site is ready for a final walk-through, and this inspection is no longer needed. | |
| 03/13/2026 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | After a second walkthrough of the subdivision I checked and verified that all punch list items have been resolved. | |
| 06/09/2026 | TRSP - PIA - Signage/Striping Final | Passed | Esther Cruz Traffic Engineering Technician did a final inspection 6/9/2026 |