Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TR-PIA-1124-00018

Parcel: 14028012A


Addresses:

6219 S SEARS BL

Inspection Status: Passed

Inspection History: TRSP - PIA - Roadway Subgrade

Date Description Inspector Results Comments
07/02/2025 TRSP - PIA - Roadway Subgrade Passed
07/07/2025 TRSP - PIA - Roadway Subgrade Passed No work on site
07/08/2025 TRSP - PIA - Roadway Subgrade Passed
07/15/2025 TRSP - PIA - Roadway Subgrade Passed
07/22/2025 TRSP - PIA - Roadway Subgrade Passed
07/23/2025 TRSP - PIA - Roadway Subgrade Passed Working on underground utilities
07/28/2025 TRSP - PIA - Roadway Subgrade Passed
07/31/2025 TRSP - PIA - Roadway Subgrade Passed Roadway has been roughly graded in at this time
08/05/2025 TRSP - PIA - Roadway Subgrade Passed Road is still only rough graded
08/08/2025 TRSP - PIA - Roadway Subgrade Passed Roadway is only rough graded at this time
08/20/2025 TRSP - PIA - Roadway Subgrade Passed Road grade is only roughly graded in as work continues on underground utilities
09/08/2025 TRSP - PIA - Roadway Subgrade Passed Density test at station 11+00 returned a result of 96% compaction. AB density on Thursday morning, paving on Friday
10/08/2025 TRSP - PIA - Roadway Subgrade Passed Today Chris from Atek conducted densities and all 3 spots passed. I walked the site with Bubba and several other Clear contracting employees and conducted a string line test of the sub-grade. The sub-grade falls within the specified parameters and they now have the green light to bring in ABC. Survey is scheduled for next Tuesday to set hubs with a possible string line on Wednesday if rain from the possible weather front does not delay things.
10/29/2025 TRSP - PIA - Roadway Subgrade Passed Subgrade is complete.