Inspection Status: Passed
Inspection History: TRSP - PIA - AB Placement
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2025 |
TRSP - PIA - AB Placement |
|
Passed |
Today Trystan and I took a sample from a pile of AB from Vulcan because the AB from PnP did not get an approval from the lab. Stringline and density of sub grade on Monday, stringline and density of AB on Thursday. |
| 09/11/2025 |
TRSP - PIA - AB Placement |
|
Passed |
The AB and roadway were tested and passed for compaction as well as string lined (@2.5") to ensure paving can occur the next day. |
| 10/10/2025 |
TRSP - PIA - AB Placement |
|
Passed |
Today the AP is being graded and watered. |
| 10/17/2025 |
TRSP - PIA - AB Placement |
|
Passed |
Due to the heavy rains over the weekend Bubba decided to open up the AB and let the subgrade dry out for a few days. As of today they are still processing the AB back into grade. String line and densities will probably be next week. |
| 10/23/2025 |
TRSP - PIA - AB Placement |
|
Passed |
String lined all three roadways that make up Cielo Reserve. All areas were within the .02' tolerance, and the density tests were all at or above 100% for compaction tested with nuclear device. |
| 10/29/2025 |
TRSP - PIA - AB Placement |
|
Passed |
AB placement is complete |